Normal startup can return only after the defective E/R unit is repaired or replaced and the drive power section becomes ready. The MMC100.2 version 04.04.13: Waiting for communicationpartners message is a downstream symptom: the operator panel is running, but one or more expected control partners have not completed startup.
Initial Symptom Split
- Record the exact display state. If
MMC100.2 version 04.04.13reachesWaiting for communicationpartners, the panel has booted far enough to wait for other subsystems. Continue with cabinet power and module-status checks. - If the display becomes black, inspect whether the display controller remains illuminated under its cover. An illuminated controller and operating cabinet cooler show that some supply branches are present; they do not prove that the CNC, drive, or E/R branches are powered.
- Inspect the rear cabinet without operating contactors by hand. If the cabinet appears inactive and all six E/R module indicators are off, stop treating the message as a software-only communication problem. Trace the E/R supply and enable chain next.
| Reading or observation | Meaning | Next check |
|---|---|---|
Waiting for communicationpartners |
MMC is alive but an expected subsystem is unavailable | Cabinet supplies and module status |
| Display controller lit; cooler operating | Incoming power reaches auxiliary branches | Control and drive branch distribution |
| All six E/R indicators off | E/R unit has no visible ready, warning, or fault indication | Input power, control power, enable chain, then module condition |
| Hydraulics run when a switch is manually actuated | The downstream hydraulic circuit can respond | Find why normal control does not command that circuit |
Cabinet Power Branch
Before anything else, confirm the cabinet against its electrical drawings. Breakers and fuses that look normal can still leave a branch unpowered because of an open contact, missing phase, failed supply, loose terminal, or absent enable. Qualified personnel must take energized measurements using the machine’s documented test points and safe working procedure.
- Measure the incoming supply at the machine disconnect. Compare the readings with the values printed on the machine documentation. Do not move on until every required conductor is present at the disconnect output.
- Trace power through the checked switches and fuses to the E/R unit input. Measure on both sides of each protective device; a visual inspection alone does not verify continuity under operating conditions.
- Measure the E/R control-power input at the terminals identified in the cabinet drawings. Correct main input with missing control power directs the fault toward the auxiliary supply, wiring, or interlock chain.
- Check the normal enable command and its return status. If the command never arrives, trace emergency-stop, guard, thermal, and machine-ready contacts shown in the circuit. If power and enable are present but all six indicators remain off, isolate the E/R unit for component-level assessment.
E/R Unit Status
The machine uses a SIMODRIVE 611 system with an E/R unit. This unit supplies the drive power section and participates in the readiness chain. A failed or unpowered E/R unit prevents the associated drive equipment from reaching its normal operating state, so the CNC communication sequence can remain incomplete even though the MMC itself starts.
Use the six indicators as a group rather than searching for a communication setting immediately. A displayed fault pattern would direct troubleshooting toward the corresponding documented condition. All six indicators being dark creates a narrower branch: either the module lacks required input or control power, its display circuitry cannot operate, or the module has failed internally. In the reported condition, the E/R unit was identified as defective.
Do not repeatedly force the adjacent switch or contactor to keep the hydraulics running. Manual actuation bypasses the command path being diagnosed and can energize machinery without the normal interlocks. Its diagnostic value is limited: it shows that the hydraulic load can respond when power is applied, not that the E/R unit, CNC readiness chain, or automatic control is healthy.
Communication Message Mechanism
Waiting for communicationpartners describes a startup dependency, not a root-cause code. The MMC expects other machine components to initialize, exchange status, and become ready. Loss of drive-section power prevents that sequence from completing, so a power-conversion failure can present at the screen as a communication wait.
A two-week shutdown does not by itself identify weak backup batteries or lost machine data. Battery-related data loss moves higher in the decision tree only when cabinet power and all required module-ready states are correct but the control reports missing, corrupt, or defaulted machine data. Determine that branch by reading the control diagnostics and comparing retained data with the machine backup.
A memory clear followed by loading standard data is therefore not the first action when the E/R indicators are all off. That operation can remove installation-specific configuration and complicate recovery. Preserve the existing data and create or locate a backup before any memory initialization. Perform a reload only after power hardware passes its checks and the control diagnostics specifically direct the investigation toward data integrity.
Resolving Procedure
- Isolate the machine using the approved energy-control procedure and wait until the drive power section is in the documented safe state. Confirm absence of hazardous voltage using the prescribed test method.
- Record the E/R unit identification, wiring positions, connector orientation, and indicator state. Use the exact installed module identification when arranging repair or replacement;
SIMODRIVE 611names the system family, not a complete replacement specification. - Before condemning the unit, verify its input power, control power, protective devices, enable input, connectors, and cabinet wiring against the drawings. Correct any missing external condition and repeat the indicator check.
- If the specified supplies and enable are present while all six indicators remain off, remove the E/R unit from service for qualified repair or replace it with the correctly matched unit. Do not select a substitute from appearance or family name alone.
- Reconnect every documented conductor and connector, restore guards and covers, then reapply power. Confirm that the E/R unit now displays its normal powered state before expecting the MMC startup sequence to advance.
Startup Verification
- Power the machine from a fully isolated state and observe the complete boot sequence. Confirm that the display remains active and no longer stops indefinitely at
Waiting for communicationpartners. - Read the E/R and CNC status indications before commanding motion. Each required subsystem must report its documented ready state; a running cooler or illuminated display controller is not a substitute for those readings.
- Test the normal hydraulic command without manually forcing a switch or contactor. Confirm that the control issues the command, the hydraulic system starts through its normal circuit, and the corresponding feedback changes state.
- Check the control diagnostics for active drive, communication, or machine-data faults. Do not release the machine until the diagnostic list is clear or every remaining entry has an identified, documented disposition.
Frequently Asked Questions
Can a weak battery cause MMC100.2 to wait for communication partners?
It can affect retained data in some control architectures, but a shutdown lasting two weeks does not diagnose battery failure. With all six E/R indicators off, verify E/R input power, control power, enable status, and module condition first.
Can I clear the memory and reload standard data to fix this message?
Only after the power and readiness checks pass and diagnostics point to lost or corrupt data. Back up the machine-specific configuration before any memory clear because standard data may not contain the installed machine settings.
Does a running hydraulic pump prove the SIMODRIVE 611 system is healthy?
No. Manual switch actuation only shows that the hydraulic circuit can respond when forced. Verify normal E/R readiness, automatic hydraulic command, feedback response, and a completed MMC communication startup as the final test.