Recovery with the current Vijeo Designer installation returns the panel to a bootable runtime state when the recovery operation completes successfully. For an XBTG 2110 that remains on Download in progress with no PC connected, use the Vijeo Designer Runtime Installer recovery option before treating the panel as defective.
Recovery decision
Before anything else, confirm that the displayed message is static and that no transfer is actually taking place. A panel can show a download message even though no programming cable is attached. In that condition, the message indicates that startup has not advanced to the operator application; it does not prove that a PC is actively downloading.
- Place the controlled machine or process in a safe state because the normal operator interface is unavailable.
- Verify that no PC or programming device is connected to the panel.
- Record the exact displayed text and any other visible status indications.
- Perform one controlled power cycle. Allow the panel to complete its normal startup sequence without pressing the screen or connecting a cable.
- If
Download in progressreturns and remains displayed, stop repeating power cycles and prepare for runtime recovery.
A repeatable screen after a controlled restart points to a persistent runtime or stored-startup problem rather than a live transfer. Do not move on until the symptom has been reproduced once with the programming cable disconnected.
Commissioning prerequisites
Prepare the engineering station and connection before starting the repair. Recovery writes runtime components to the panel, so unstable power or a broken communication path can leave the unit in the same state.
| Item | Required condition | Confirmation |
|---|---|---|
| Engineering software | Latest available Vijeo Designer version with available patches applied | Software and patch installation completes without errors |
| Recovery utility | Vijeo Designer Runtime Installer is available | The utility opens and presents a Recovery option |
| Panel connection | Compatible connection from the engineering PC to the panel Toolport
|
The recovery utility can communicate with the target |
| Power | Stable panel and PC power for the entire operation | Neither device resets or loses power during preparation |
| Machine state | Operation does not depend on the unavailable HMI | The process is stopped or controlled by an approved alternate method |
Use the Toolport named in the recovery procedure, not a connector selected only because it physically accepts the cable. Do not move on until the Runtime Installer opens and the panel connection is ready.
Vijeo Designer update
Update Vijeo Designer before transferring recovery files. Available patches can include runtime corrections, so launching an older installed utility may write the same runtime condition back to the panel or omit a relevant correction.
- Close active Vijeo Designer projects and transfer utilities.
- Update Vijeo Designer to the latest version available for the engineering installation.
- Apply the available patches for that installation.
- Restart the engineering software environment if the installer requests it.
- Open Vijeo Designer and confirm that the updated installation starts normally.
Keep the project files separate from the runtime repair decision. Runtime recovery addresses the panel startup environment; restoring or downloading the application is a later operation if the recovery process requires it. Do not move on until the updated Vijeo Designer installation and its tools open without an installation error.
Runtime Installer recovery
Connect the engineering PC to the panel Toolport, then start the supplied recovery utility. The referenced program path is Program Files > Schneider Electric > Vijeo Designer > Tools > Runtime installer. The operating system may expose the installed program group differently, but use the Runtime Installer belonging to the updated Vijeo Designer installation.
- Apply stable power to the
XBTG 2110and keep the machine in its safe state. - Connect the programming cable between the PC and the panel
Toolport. - Launch
Runtime installerfrom the Vijeo Designer tools. - Select the
Recoveryoption rather than starting an ordinary application download. - Select the connected target using only settings exposed by the installed utility and the actual connection.
- Start recovery and watch both the PC utility and panel for progress or an error indication.
- Leave the cable and power connected until the utility reports completion. Do not interrupt the transfer because the original panel message remains visible during part of the operation.
- Follow any restart instruction presented by the recovery utility.
The recovery path is the key distinction: a normal project transfer assumes a working runtime, while recovery repairs the startup environment needed to accept and run that project. Do not move on until the utility reports successful completion or provides a specific connection or recovery error for diagnosis.
Failed-recovery decision path
If the Runtime Installer cannot begin recovery, diagnose the connection before replacing the panel. If recovery completes but the same screen returns, separate an application problem from a panel or storage fault.
| Observed result | Next action | Required proof |
|---|---|---|
| Target is not detected | Check that the cable is on the Toolport, verify the PC connection, and reopen the utility |
The target becomes selectable or the utility produces a specific communication error |
| Recovery stops with an error | Record the complete error text, confirm stable power, and retry only after correcting the reported condition | The next recovery attempt advances beyond the previous failure point |
| Recovery succeeds but no application opens | Use the correct Vijeo Designer project and normal transfer procedure if the application must be restored | The intended application starts without a transfer cable attached |
Recovery succeeds but Download in progress returns |
Escalate to Schneider Electric through an official support or warranty channel | Provide the model, symptom, software update status, recovery result, and recorded errors |
A hardware defect becomes the practical next diagnosis when a current, patched Runtime Installer completes recovery yet the startup fault persists, or when the panel repeatedly cannot retain or execute the recovered runtime. Do not move on to replacement until the recovery result and connection test have been recorded.
End-to-end verification
- Disconnect the programming cable after all transfers report completion.
- Restart the panel under controlled conditions.
- Confirm that
Download in progressclears and the intended operator application opens. - Check that displayed values update and that the application reaches its normal controller or device communication state.
- Test permitted navigation, status indications, alarms, and a low-risk operator command according to the machine commissioning procedure.
- Perform one additional controlled restart with no PC attached and confirm that the same application starts again.
The repair passes only when the panel boots independently, the application operates, communications return, and the result survives a second controlled restart.
Frequently asked questions
How do I recover an XBTG 2110 stuck on Download in progress?
Update Vijeo Designer and apply its available patches, connect the PC to the panel Toolport, open Program Files > Schneider Electric > Vijeo Designer > Tools > Runtime installer, and select Recovery.
How do I know whether an XBTG 2110 is actually downloading?
Disconnect the programming cable and perform one controlled restart. If the same message remains with no PC attached, treat it as a runtime startup fault rather than an active transfer.
How do I proceed if the Runtime Installer cannot find the panel?
Confirm that the connection is made to the Toolport, verify the PC-to-panel link, and reopen the recovery utility. Record the complete communication error if the target remains unavailable.
How do I verify that XBTG 2110 recovery worked?
Disconnect the PC, restart the panel, confirm that the application opens and communicates normally, then perform a second controlled restart with no cable attached and verify the same result.