Short answer

A program pulled from an ST6400 panel is a VML file, and EcoStruxure Operator Terminal Expert V3.1 SP1 and V3.2 have no project-upload function that converts it into an editable PC project. Load the VML back through the panel's hardware configuration screen using USB storage. To edit the application, get the original engineering project.

On this page
  1. What the ST6400 upload actually produces
  2. The transfer directions and what each one supports
  3. Uploading the VML file from the panel to USB
  4. Loading the VML file back onto a panel
  5. Why the VML file will not open as a project
  6. Getting an editable project instead
  7. Questions asked

An ST6400 upload produces a VML file, and that file has one documented use: loading the application back onto a panel through the hardware configuration screen. EcoStruxure Operator Terminal Expert (EOTE) has no project-upload function — Schneider Electric documents its absence in V3.1 SP1 (FAQ FA403903), and the option is still missing in V3.2 — so the VML file cannot be opened, imported or converted into an editable PC project. The steps below cover the USB upload from the panel, the USB load back onto a panel, and the only real route to an editable application: the original engineering project.

What the ST6400 upload actually produces #

Uploading from the panel is not a project export. The panel runs a compiled application image, and the hardware configuration screen can write that image to USB storage as a VML file. The thing you edit in Operator Terminal Expert — screens, objects, animations and variable bindings held as an engineering project — exists only on the PC where it was created. The upload copies the finished image, so nothing inside the VML file maps back to editable objects. Treat the two artifacts as different by design: project on the PC, image on the panel.

The transfer directions and what each one supports #

Four directions exist around an ST6400, and only three of them are real:

Direction Where the function lives Result
Panel to USB Panel hardware configuration: touch [USB] in [ Upload to] VML file on the storage device
USB to panel Panel hardware configuration load function Application restored on that panel
PC to panel Operator Terminal Expert transfer, including the file-system method through external storage Panel runs your edited project
Panel to PC as a project Operator Terminal Expert Not available in V3.1 SP1 or V3.2

The third row is the ordinary engineering workflow. If that transfer stalls on the way to the terminal, why an Operator Terminal Expert download fails to reach the HMI covers the download side. The fourth row is the one this article exists for: it is empty, and no cable choice or file rename fills it.

Uploading the VML file from the panel to USB #

The documented sequence from Schneider Electric (FAQ000258733) is:

  1. Turn the panel on and let the application start.
  2. Insert the external storage device into the panel.
  3. Open the Hardware Configuration screen.
  4. Touch [USB] in [ Upload to].
  5. Leave the storage device in place until the write finishes, then keep the VML file unchanged on it.

The resulting VML file is a restore image of exactly what the panel was running when you copied it, and it is meant to be consumed by another panel, not by the engineering software.

Loading the VML file back onto a panel #

  1. Insert the storage device holding the VML file into the target panel.
  2. Open the Hardware Configuration screen.
  3. Start the load function on that screen and select the VML file from the storage device.
  4. Let the panel replace the application and restart the runtime.
  5. Verify the expected application starts and that the screens and operator functions behave as they did before.

Do the load with the machine in a safe state: the runtime is replaced while you work, and the operator has no working screens until the restart completes. The same screen handles both directions — upload writes from panel to USB, load writes from USB to panel — so nothing needs to be configured on the PC side for either step.

Why the VML file will not open as a project #

The missing menu command is the whole story. The software has no function that reads a panel upload back into the editor, so there is no file-format negotiation to get right. Renaming the extension, repackaging the file or offering it to every import dialog changes nothing, because the VML file contains the compiled image, not the project structure the editor works with. Decision: stop trying to open it in Operator Terminal Expert. That path does not exist in this software generation, and time spent on it is time taken from the real route below.

Getting an editable project instead #

Editing requires the engineering project that produced the application — from the machine builder, your own project archive, or whoever last modified the line. When that file is gone, how to recover an HMI program when the source file is lost is the procedure to work through before conceding a rebuild. A rebuild means creating a new project in Operator Terminal Expert and recreating the screens; the controller side is unaffected, so the machine keeps running while you rebuild the visualization.

The decision by case:

  • Restoring or cloning panels: upload and load the VML through the panel's hardware configuration.
  • Editing the application: use the original engineering project; the VML file plays no part.
  • Project lost: attempt recovery first, then rebuild, treating the VML copy as the reference for what each screen did.

Questions asked

Did a later Operator Terminal Expert version add project upload?

Not as of V3.2. Schneider Electric's documented statement covers V3.1 SP1, and the project-upload option is still absent in V3.2. The release notes of any version you upgrade to are where that function would be announced, so plan on the VML-to-panel route rather than an editor import.

The VML file will not load from USB on a Harmony iPC. What is different there?

On a Harmony iPC the hardware configuration tool needs elevated Windows rights: right-click the shortcut and choose Run as Administrator before you attempt to load the VML file from the Hardware Configuration screen, as Schneider Electric documents in FAQ000220992. The panel-side sequence itself is unchanged.

Can I bring the controller variables back instead of retyping them?

Yes, if the controller is programmed in EcoStruxure Machine Expert. Export the variables to an .XML file and import that file into your Operator Terminal Expert project. That rebuilds the tag list, not the screens and objects, which you still recreate by hand in the rebuilt project.

Is the USB stick with the VML file a backup of my application?

It is a restore copy for panels, nothing more. The VML file reloads the same application onto a terminal, but it cannot be edited or extended, and it carries no source, comments or project history. Keep it alongside the engineering project, never instead of it.

Keep reading

  • How-to

    One FactoryTalk View ME Project Builds One PanelView Runtime

    One FactoryTalk View ME project creates exactly one .mer runtime, and that runtime runs on one PanelView Plus terminal. Two terminals therefore take the same .mer loaded on both, or two separate projects. For one controller and two identical 2711P terminals, build once and load twice; split into two projects only when screen size, resolution or communication targets differ.

    HMI and touchscreens

  • Comparison

    TIA Portal vs STEP 7 plus WinCC hardware configuration

    Configuring the same PLC and HMI in TIA Portal instead of STEP 7 plus WinCC needs no extra PLC, panel, module or network hardware — the cabinet stays exactly as it is. The difference is where devices, networks and tags are configured: one integrated project instead of two. The one hard limit: S7-1200 and S7-1500 CPUs engineer only in TIA Portal, and CPU firmware sets the minimum release, so a V2.9 CPU needs TIA Portal V17 or higher.

    HMI and touchscreens

  • Troubleshooting

    E-Designer to Exter Project Conversion and Transfer Path

    E-Designer cannot download to an Exter T150: the terminal accepts applications only from Information Designer. Convert the .mpa project through the maker's conversion service or a licensed Information Designer seat, verify the target, driver and objects, then export a .Dat project transfer file to USB or CF card that the T150 loads automatically. Replace the terminal with current hardware only when the terminal itself is the failing part.

    HMI and touchscreens