Short answer

Yes: one WinCC Unified project serves five machine screens plus a line overview. Choose between dedicated Unified panels per machine or one Unified PC Runtime with browser clients; the runtime license includes two access points but only one control-mode connection, so five operating stations need four additional WinCC Unified Client Operate licenses.

On this page
  1. Choose the architecture first
  2. License count for the runtime route
  3. Build the machine separation into the project
  4. Central overview options
  5. Acceptance test before handover
  6. Decision
  7. Questions asked

Yes, WinCC Unified does this in one project: five machine-level screens plus a central line overview, all reading one S7-1500 series PLC. The decision you make up front is the architecture, because it drives the licensing. The TIA Portal licensing documentation is the reference for the client counts below.

Choose the architecture first #

There are two clean routes; mixing them is possible later but decide on one now, because the station hardware, the licensing and the engineering effort all follow from it.

Architecture Station hardware Best fit
One WinCC Unified PC Runtime A touch-enabled panel PC or any HTML5 browser client per machine You want one runtime to maintain and standard IT hardware
Dedicated Unified panels One Unified Comfort Panel per machine, plus one for the overview You want a sealed device per machine and no PC runtime licensing

For the runtime route, the machine stations can be industrial panel PCs or browser clients; a station that needs its own fixed start screen must run My WinCC Unified, which requires Windows. A browser-only station works for monitoring and operation but cannot pin its own start screen that way, so plan its navigation inside the project instead. When the machine stations will be industrial panel PCs running the runtime or browser clients, size them for the screen each operator actually needs at that machine.

License count for the runtime route #

The WinCC Unified PC Runtime license includes two access points for operator control and monitoring, but only one of them can be connected in control mode at a time. Control mode is what lets an operator press buttons; monitoring alone shows values.

Worked example for this line:

  • Five machine stations that must each operate their machine, plus one overview station that only monitors.
  • Included with the runtime: 2 access points, of which 1 can be in control mode.
  • Control-mode sessions needed: 5. Additional WinCC Unified Client Operate licenses: 5 − 1 = 4.
  • The monitoring-only overview fits inside the second included access point.

So buy one WinCC Unified PC Runtime license plus four Client Operate licenses, and confirm the exact V21 counts in the current license conditions before ordering, because the bundled access points have changed between versions. If a sixth station must also operate, add one more Client Operate license for it; if two stations only monitor, both fit inside the included access points and the count drops accordingly. Count the jobs, not the screens: one physical station that alternates between two machines still needs only one control-mode connection.

Build the machine separation into the project #

With one PLC and one connection, the machine identity is your design work:

  1. Create one tag group, alarm group and screen folder per machine (Machine 1 through Machine 5).
  2. Give each machine screen a visible machine name in the header; the operator must never doubt which machine a button drives.
  3. Assign each runtime client a start screen via My WinCC Unified, or navigate by a station selector screen. The PLC can also drive screen changes, as covered in changing the HMI screen from the PLC in WinCC Unified.
  4. Keep the overview monitor-only unless you deliberately design line-level commands with their own user permissions.

Keep the per-machine tags internally consistent: the same tag naming pattern in every machine group makes the overview tiles copy-paste work instead of new engineering. Route the alarms the same way, so the overview's alarm view can filter by machine group rather than by hand-picked alarm names.

For dedicated panels, configure each panel as its own project device; a small script that reads the device name can open the matching machine screen at startup. Test that selection on every device before commissioning, because a panel that was swapped during maintenance will show the wrong machine until its device name is corrected.

Central overview options #

For the runtime route, the overview is just another client showing an overview screen with all five machines' status tiles. For the panel route, a Unified Comfort Panel with its Web Client enabled (runtime settings, Remote access, Web Client, enable web access to runtime) can act as the mini-SCADA station. Load your actual overview on the intended device and watch all five machines change state over the production network path; graphic complexity and update rates decide whether it feels live. Measure the update delay with timestamped observations rather than by eye, and set the overview's refresh so a status change at a machine appears on the overview within the time your operators need.

Acceptance test before handover #

Run this on the line with the machines in a safe state, or on the bench with simulated tags first:

  • Open each station's start screen and confirm the machine name shown matches the machine in front of it.
  • Operate one command from each station and confirm only that machine responds.
  • On the overview, force each machine into a different state and confirm five distinct indications update.
  • Count simultaneous control sessions during the test: with the licensing above, all five stations must be able to operate at once.
  • Disconnect one station mid-session and confirm it reconnects and lands back on its own machine screen.

Decision #

  • Want sealed devices and no client licensing: five Unified Comfort Panels plus one overview panel, one project, screen selection by device name.
  • Want one runtime and standard hardware: WinCC Unified PC Runtime on an industrial PC, browser or panel PC stations, one runtime license plus four Client Operate licenses, My WinCC Unified on Windows stations that need a fixed start screen.

Either way, keep the overview monitoring-only and machine control at the machine stations unless you design line-level commands deliberately, with permissions that name who may issue them.

Questions asked

Can the line overview run on a Unified Comfort Panel instead of a PC?

Yes. A Unified Comfort Panel with its Web Client enabled can serve as the central overview station, reading the same project data. Enable web access in the runtime settings under Remote access, then test the production overview on that device for update behavior and response before committing to it.

Do monitoring-only stations also need Client Operate licenses?

The runtime license already includes two access points for operator control and monitoring, and additional Client Operate licenses are what raise the number of simultaneous control-mode connections. A station that only watches the overview fits inside the included access points; count the stations that must operate and license those.

Can one station's start screen be fixed to its own machine?

Yes, with My WinCC Unified, which assigns a station-specific start screen per client and requires a Windows operating system on that station. Without it, give each station a clear navigation path or select screens in the project by device name, and verify on every device that the correct machine screen opens.

Does every machine need its own PLC connection?

No. All five machines can be controlled from one S7-1500 series PLC, and the Unified project needs one connection to that PLC. The machine separation lives in the project structure: per-machine tag groups, alarms and screens, so each station's controls act on its own machine's data.

Keep reading

  • How-to

    Fixing a WinCC PC station download comms error from TIA Portal V13

    When TIA Portal V13 compiles but the download to a WinCC PC station fails, the transfer channel to the runtime loader is broken while the HMI itself is healthy. Compile to file, copy the .hmi PData file to the path shown in the WinCC Runtime Loader settings, restart runtime from the loader, then align the firewall, channel settings and PC station IP to restore normal downloads.

    HMI and touchscreens

  • Selection guide

    Running an Ignition Vision Client as a Machine HMI Without Edge

    No Edge license is needed. A Vision client at the machine is one more client session of your existing on-site gateway, so the only check is whether that gateway's license counts clients. Edge is a separate device-level gateway for machines that must keep running with the site link down; your panel HMI stays as the OPC UA server either way.

    HMI and touchscreens

  • Selection guide

    Do You Need SCADA Software for a Modbus HMI Project

    No. Modbus only proves a possible data link, so pick the runtime target first: a touch panel programmed by its own editor for machine-side parameter control, or a licensed PC SCADA runtime when the screens must run on a computer. The documented demonstration mode of a Vijeo Citect-class runtime stops after about 15 minutes with live devices, which settles a bench test but not continuous operation.

    HMI and touchscreens

Showing Tags From Five PLC-5 Processors on One PanelView Plus