Short answer

Measure the 24 V DC input at the TP900 Comfort terminals under load first. Correct voltage plus ProSave or TIA Portal communication means you can attempt the documented OS update or factory reset; correct voltage with no communication means a service evaluation, while TIA Portal simulation with the PG/PC interface set to the PC's TCP/IP card keeps the operator screens running meanwhile.

On this page
  1. Is the panel really getting 24 V DC at its terminals under load?
  2. What does the screen do on a power cycle once power is confirmed?
  3. Can ProSave or TIA Portal still communicate with the panel?
  4. How do you run the OS update or factory reset in ProSave?
  5. What if the voltage is correct but nothing communicates?
  6. How do you keep the operator interface running while the panel is away?
  7. Questions asked

A TP900 Comfort that powers up to a black screen, with no Windows-based operating system launching and no HMI project appearing, has one of three causes: the 24 V DC input is not reaching the panel correctly, the panel's internal power circuit is damaged, or the operating system has stopped starting. Measure the DC voltage at the panel's own terminals under load before anything else, because that one reading decides the branch. If the voltage is correct, the next gate is whether ProSave or TIA Portal can still communicate with the panel: communication means the documented OS update or factory reset is available, and no communication means a service evaluation. Meanwhile, TIA Portal simulation on the engineering PC keeps the operator screens running against the real PLC. For the generic power-versus-display decision on panels of any type, the article on why an HMI shows a black screen while the PLC keeps running covers the broader case; this one is specific to the Windows-based Comfort panel.

Is the panel really getting 24 V DC at its terminals under load? #

Measure with a multimeter directly at the TP900's power input terminals while the panel is connected and attempting to start, because a reading held at nominal during the start attempt, not the power supply's front-panel lamp, is what clears the supply branch. An upstream indication proves nothing: a loose terminal screw or an undersized conductor can drop several volts the moment the panel draws its start current.

Worked example, with illustrative readings. The supply is adjusted to 24.1 V at its output and the panel's terminals read 23.9 V while idle, a 24.1 − 23.9 = 0.2 V drop across the wiring, which is normal. During the start attempt the terminal voltage sags to 17.7 V, a 24.1 − 17.7 = 6.4 V collapse under load. That reading convicts the supply path, not the panel: check the terminal torque, the conductor gauge and the power supply's capacity, fix the path, and repeat the measurement before touching anything else. If instead the terminals hold 23.8 V through the whole start attempt, the supply branch is cleared and you move on.

What does the screen do on a power cycle once power is confirmed? #

Power-cycle the panel once and record exactly what the display does, because three distinct outcomes, a completely black screen, a startup logo that gives way to black, or a blinking underscore in a corner, all route to the same recovery gate but point at different failures. Watch the first thirty seconds; the earliest frame is the evidence.

  • Completely black from the first second: the display backlight may be unpowered, so internal power-circuit damage moves up the list.
  • Startup logo appears, then black: the panel boots partway, so an operating-system start failure is the leading candidate.
  • A blinking underscore in the top corner: the backlight and display are alive and only the operating-system launch is failing, which still does not prove the panel is recoverable.

None of these outcomes changes the next step: every one of them goes to the communication test, because that test, not the symptom, decides whether recovery is possible from your bench.

Can ProSave or TIA Portal still communicate with the panel? #

This is the gate that decides whether you can recover the panel yourself: if either ProSave or TIA Portal online access reaches the panel, the documented recovery is available, and if neither does from a verified interface, it is not. Work through the connection in a fixed order so a failed attempt means something.

  • Check the Ethernet cable and the link LED at the panel port.
  • Put the engineering PC on the panel's network, for example the 192.168.0.x subnet, so both sit in the same subnet.
  • Open the PG/PC interface setting in the engineering PC's Control Panel and select the PC's actual network card entry, not a simulation or virtual adapter.
  • Scan with ProSave's device selection and with TIA Portal's online view; either one answering counts as communication.

A failed attempt with an unverified interface selection is not evidence about the panel. Only a panel that stays silent with the voltage confirmed, the cable confirmed and the interface confirmed has passed this gate in the wrong direction.

How do you run the OS update or factory reset in ProSave? #

Once communication is confirmed, run the operating system update in ProSave with the "Reset to factory settings" option enabled; the progress of the update is displayed both in ProSave and on the HMI device, and the panel restarts when it finishes. The documented sequence is:

  1. Open ProSave on the engineering PC.
  2. Select the HMI device type and the network interface you verified in the previous section.
  3. Choose the operating system update function and enable "Reset to factory settings".
  4. Start the update and let it run to completion without removing power; the progress bar on the panel is your confirmation that data is transferring.
  5. After the restart, download the HMI project from TIA Portal and verify the runtime starts and shows live values.

The reset returns the panel to its delivered state, so the project, recipes and logged data on it are gone. Before you start, confirm the current project archive exists on the engineering side; without it you are erasing the only copy.

What if the voltage is correct but nothing communicates? #

Correct input voltage combined with no communication from a verified interface means a software reset cannot be completed, and the panel goes to the manufacturer's service evaluation with your measurements attached. Be precise about what you know: a connection that never established means the reset never started, not that the reset failed, so do not report a failed reset. Report correct terminal voltage under load, the observed boot behavior and the verified interface details.

That record saves the service center the diagnosis you already did. When the evaluation comes back with an uneconomical repair, a PC-based HMI runtime on industrial panel PCs can take over that operator station, with the project migrated rather than rewritten.

How do you keep the operator interface running while the panel is away? #

Start the TP900 project as a simulation in TIA Portal on the engineering PC and set the PG/PC interface in the Control Panel to the PC's TCP/IP network card, so the simulated runtime connects to the real PLC instead of to a simulated one. The interface entries follow the pattern NetworkcardName.TCPIP.1, where the first part is the card's own name; the entry names the real adapter, which is what routes the connection to the controller. The connection checks are the same ones covered in testing HMI simulation against a live PLC.

Before the shift relies on it, verify live values, alarm display and every operator write. The simulated runtime writes to the real PLC with real consequences, so exercise the writes against non-critical or test tags first. The simulation is a bridge for the repair or the migration, not the repair itself: it lives on the engineering PC, with that PC's runtime license, and it ends when the panel comes back or a PC-based runtime is commissioned.

Questions asked

Why does my TP900 Comfort show only a blinking underscore after power-up?

A blinking underscore tells you the backlight and display are powered, so the fault sits in the operating-system start, not the screen itself. It is not a confirmed cause of anything specific: measure the input voltage first, then test whether ProSave or TIA Portal reaches the panel before choosing between a reset and a service evaluation.

Does a failed ProSave connection prove the panel is beyond repair?

No. A connection that never establishes means the reset never started, not that it failed. Verify the network cable and link LED, put the engineering PC in the panel's subnet, and confirm the PG/PC interface points at the correct network card before concluding anything. Only a panel with verified power and no communication from a verified setup goes to service.

Is the HMI project still on the panel after a factory reset?

No. Resetting to factory settings returns the panel to its delivered state and removes the loaded project and its data. Reload the project from TIA Portal afterwards, which is why the project archive and any recipe or logging settings must be current before you start recovery. Without an archive, the panel's contents cannot be recovered from the reset device.

Can the simulation stay as the permanent operator station?

It can run for longer than a repair, but it is a stopgap: it depends on the engineering PC, its Windows session and the runtime license on that PC, and it has no panel-rated enclosure at the machine. Use it to bridge the repair or a migration to a PC-based runtime, and exercise operator writes against non-critical tags first because the simulation controls the real PLC.

Keep reading

  • Troubleshooting

    Why an Omron HMI Stays Stuck on Program Initializing

    An Omron operator panel stuck on the initializing text is in one of three states: empty project memory, a failed PLC link, or rear DIP switch 1 left on so a reset enters programming mode. Clear the passive causes first — switch positions, cable continuity, matching port settings — and treat the PLC's own error as a separate fault.

    HMI and touchscreens

  • Troubleshooting

    Why a PanelView 550 Shows Nothing but the PLC Communicates

    A PLC link that works proves nothing about the PanelView: if the 550 shows no display, menu, or reset response, treat it as a terminal power or hardware fault. Verify a stable 24 VDC at its terminals under load before touching DF1, cable wiring, or pass-through settings.

    HMI and touchscreens

  • Troubleshooting

    Why a TP177A Shows a Light Blue Screen on Power-Up

    A TP177A on a uniform light blue screen has power and backlight but its boot chain stops before the operating system loads, usually a corrupted OS image in flash after an interrupted transfer or power event. Run an OS update with ProSave and catch the transfer at power-on; if the panel will not take the image twice, treat it as a hardware fault and repair or replace the unit.

    HMI and touchscreens