Troubleshooting
Why a CPX-FB13 PROFIBUS DP slave shows bus failure LEDs on a panel PC
Short answer
A CPX-FB13 flashing its bus fault LED while the master interface shows EXTF and BUSF1 means the DP connection never reached cyclic data exchange. Work the startup chain in order: island power and cable, termination at the two segment ends only, node address against the configured slave address, then the configured module layout against the installed assembly. Application logic is never the fix.
On this page
- What does the flashing bus fault LED on the CPX-FB13 actually mean?
- Does the island have power, and does the bus reach it?
- Is termination switched on at both ends of the segment and nowhere else?
- Does the node answer at the station address the master calls?
- Does the STEP 7 module layout match the installed island?
- Does the node need the local configure press?
- What do you fix first, and how do you retest safely?
- Questions asked
When a CPX-FB13 flashes its red bus fault LED while the master interface shows EXTF lit and BUSF1 flashing, the DP connection has never reached steady cyclic data exchange. The LEDs name the failed stage, not the cause: PROFIBUS startup is a chain, and you test the chain in the order the protocol uses it. Check the island's power and the physical bus first, then the termination at the two segment ends, then the station address the master calls, and last the module layout the master sends at parameterization. The typical case — a panel PC 477B running WinLC RTX as DP master, a STEP 7 project that downloads cleanly, no I/O at the island — resolves inside those four checks, before anyone touches application logic.
What does the flashing bus fault LED on the CPX-FB13 actually mean? #
It means the node is powered and listening but not in cyclic data exchange with a master: the pattern names the failed stage, not the cause, and the four checks that follow divide the failure into power, termination, address and configuration. PROFIBUS DP (IEC 61158) starts every slave the same way: the master calls the station, sends parameterization data, then configuration data, and only then begins cyclic exchange. A slave that is powered but left out of exchange flashes bus fault, and the master's interface flags the same event from its side. The CPX-FB13 data sheet documents exactly that indication: a bus-specific BF LED for bus faults, plus device-specific diagnostics. Two consequences follow. The master's diagnostic buffer is more specific than any LED, so read it before changing anything. And because startup has stages, the checks below follow those stages — each one eliminates a cause class before the next.
Does the island have power, and does the bus reach it? #
Before anything in software, confirm the CPX island has its supply voltage and the cable route is intact, because a master cannot exchange data with an unpowered or disconnected slave and no configuration download will change that. Work through the physical path:
- Read the power indication at the bus node and every module and measure the supply against the node's specified voltage: the flashing BF LED proves the node's electronics are alive, not that the whole island is fed.
- Inspect both bus connectors: seating, the screw or crimp contacts, and the data-line assignment against the connector's documentation. Reversed data lines stop the bus at any address setting.
- On the panel PC, confirm the runtime owns the interface the cable is plugged into: the PROFIBUS interface assignment in the PC station configuration must match the downloaded hardware configuration. A clean download over the programming connection proves the programming path only, never the DP master path.
- Note where the segment physically ends; the next check needs it.
One more rule at this level: every station runs at the rate configured for the subnet, and a rate mismatch produces this same no-exchange pattern — why an OP77B project transfer fails over PROFIBUS at 1.5 Mbps shows how that mismatch looks from the master side.
Is termination switched on at both ends of the segment and nowhere else? #
PROFIBUS needs its termination network active at the two physical ends of the segment and switched off at every station in between, and each end connector must also receive about 5 V from its station or the termination stays dead. The network lives inside standard PROFIBUS connectors: 220 Ω across the data pair, with 390 Ω from each data line to the supply rails, enabled by the connector's termination switch and fed from the station's supply contacts.
Worked example, healthy segment, bus power off, only the two end terminations switched on: the two 220 Ω networks sit in parallel across the data lines, so the meter reads (220 × 220) / (220 + 220) = 110 Ω.
A 220 Ω reading means exactly one end is terminated; 220 / 3 ≈ 73 Ω means one intermediate connector is also switched on — find it by switching middle connectors off one at a time; near 0 Ω means the pair is shorted. Then power the segment and measure the feed at each end connector: about 5 V between the connector's supply and ground contacts. A switch set to on with no feed voltage behind it is an inactive termination — fix the feed, or make a powered station the segment end. The same measurement as a step-by-step procedure is in how to check PROFIBUS termination when an HMI reads no data.
Does the node answer at the station address the master calls? #
The address set on the CPX-FB13 must equal the slave address in the STEP 7 hardware configuration, must be unique on the segment, and must sit in the range 0 to 125 that PROFIBUS assigns to stations, because 126 and 127 are reserved. Use the Festo documentation for the installed node to set and read the address — the mechanism differs across the CPX family — and trust only the address read back online, never a switch position. Then let the master's online diagnostics divide the fault:
| Diagnostics show | Meaning | Where the fix is |
|---|---|---|
| No response at the configured address | The station is unreachable | Power, cable, termination, address — the checks above |
| A response, then rejection of parameterization or configuration | The node hears the master and refuses the startup data | The module layout — the next check |
| Cyclic exchange running, device diagnostics pending | The bus is up; a CPX module reports a local fault | The module and channel diagnostics |
Read the controller's diagnostic buffer alongside the slave diagnostics; the LEDs alone never assign the cause.
Does the STEP 7 module layout match the installed island? #
When the slave answers but refuses to enter data exchange, compare the configured island with the installed one module by module and in physical order, because at startup the master sends parameterization and configuration data that the node accepts only as an exact match. Check four things:
- The slave is placed from the Festo GSD device description for the exact node type; that description carries the module catalogue the node will accept.
- Identity, order and data lengths match: every configured module, in physical sequence, with the input and output bytes the installed module actually has. One swapped pair or one wrong byte count keeps the node out of exchange.
- PLC I/O address allocation is a separate matter — it decides where the application sees the data, never whether the slave accepts the layout.
- Station detection and data exchange are two results; passing the first proves only that the address is right.
If the project side itself is unclear — which STEP 7 variant a WinLC RTX station needs, and where the hardware configuration lives — settle that with what STEP 7 is in a PLC project and which one you need before editing the DP master.
Does the node need the local configure press? #
Only once the earlier checks pass does a five-second press of the 'configure' key become a candidate: it is a reported commissioning step for these islands, and what it stores, and in which operating state, must come from the Festo documentation before you use it. The order matters because a configuration control can store an assembly, change behaviour or reset settings — pressing it while the real fault is power, termination or address proves nothing. If every check above has passed and the documentation describes a store-and-activate action for the assembly, perform it exactly as documented, then re-read the LEDs and the diagnostic buffer.
What do you fix first, and how do you retest safely? #
Fix the first failed check and nothing else, then re-read the LEDs: one change at a time keeps every result readable, and the table below maps each measured finding to the single action that follows.
| Measured finding | Decision |
|---|---|
| No supply at the island | Restore power; leave the project alone |
| 110 Ω not seen across the pair — 220 Ω, 73 Ω or near 0 Ω instead | Correct termination at the two ends only, or repair the pair |
| No feed voltage at an end connector | Fix the feed, or make a powered station the segment end |
| Node silent at the configured address | One of the two addresses is wrong; set node address and configured slave address equal |
| Node answers and rejects the startup data | Correct the module layout or the GSD, download once |
| Exchange running, diagnostics pending | Read the CPX module diagnostics; the bus fault itself is cleared |
One safety point before the retest: isolate the island's output power stages, because the first valid data exchange applies the master's output image at once. BF out on the node, and BUSF1 and EXTF out on the interface, mean cyclic exchange is running. When power, termination and address have all passed their checks and the node still rejects the startup data, the layout is the only startup stage left — put the effort into the hardware configuration, not the application logic.
Questions asked
Do you need the Festo GSD file before configuring a CPX-FB13 in STEP 7?
Yes. The slave is placed from its GSD device description, and the master builds the parameterization and configuration telegrams from that description. Install the GSD file for the exact node into the hardware catalog first; a similar-looking generic DP slave produces a startup layout the node rejects.
What happens to the CPX outputs while the bus fault LED flashes?
The CPX-FB13 data sheet names a fail-safe response as the node's diagnostic behaviour, so the outputs do not hold their last commanded state while the fault persists. Plan the machine around that: anything wired to the island sits in its de-energised state until cyclic exchange returns, and the first exchanged output image takes effect at once.
Why does the fault persist after downloading the same hardware configuration again?
A download replaces only what the master stores. An unpowered island, an inactive end termination or a node address that differs from the configured slave address fails identically every time, so the same configuration proves the same fault repeatedly. Download again only after a measured finding has actually changed something.