Short answer

The CP5613 link from a WinAC RTX PC to its ET200M rack carries field I/O and never operator traffic. Configure the WinCC operator station as its own TCP/IP connection to the controller PC's reachable Ethernet address, with the rack and slot from the station configuration, and point the operator PC's PG/PC interface at the Ethernet adapter. No simulated station is needed in the controller's hardware configuration.

On this page
  1. The I/O link is not the operator path
  2. Configure the operator connection step by step
  3. Worked example: same-subnet check for 192.168.0.100 and 192.168.0.101
  4. Verify in this order
  5. What to leave alone
  6. Questions asked

The CP5613 that links your WinAC RTX PC to its ET200M rack is the I/O path, and it will never carry the WinCC client's traffic — which is why the operator station stays dark while the I/O runs fine. Give the operator station its own TCP/IP connection instead: target the controller PC's reachable Ethernet address, enter the rack and slot from the software controller's station configuration, and point the operator PC's PG/PC interface at the Ethernet adapter that reaches it. The steps below fit a PCS 7 V8.1 installation with WinAC RTX V4.6, followed by the subnet arithmetic and the order to verify in.

The controller PC in this installation runs two unrelated communications. The CP5613 masters the ET200M rack over PROFIBUS: that is the I/O path, configured and diagnosed on the controller's hardware side. The operator station is an Ethernet client that talks TCP/IP to the controller PC through the Ethernet adapters of the two PCs, with its own address, its own interface selection and its own rack and slot. The paths share a PC and nothing else. A healthy I/O link therefore proves nothing about the client's path, and a dead client link says nothing about the I/O, so treat them as separate systems and check them in the order given below.

Configure the operator connection step by step #

  1. On the controller PC, record the Ethernet adapter and the IP address the operator station will reach, taken from that adapter's TCP/IP settings — not from the PROFIBUS card. If that address has to change, do it with the machine in a safe state: the adapter may also carry engineering access and other stations, and all of them drop when the address moves.
  2. On the operator PC, open the "Connections" editor of the operator project and set the connection to the controller to run over Industrial Ethernet (TCP/IP), with the controller PC's Ethernet address as the partner address.
  3. Enter the rack and slot exactly as the software controller's station configuration reports them. Read them from that configuration; a guessed pair fails even when the addressing is perfect.
  4. Open Control Panel on the operator PC, run "Set PG/PC interface", and assign the Ethernet adapter linked to the TCP/IP network to the access point the WinCC connection is bound to. If a PROFIBUS card sits in the operator PC, it is not this connection's interface.
  5. Change nothing in the controller's HW Config: a TCP/IP client needs no simulated PC station and no extra communications processor — address, rack and slot are the whole requirement.
  6. For a direct link, keep both PCs on one subnet, using the check in the worked example; on a routed site network, confirm the route instead.
  7. Apply the settings, restart the runtime and watch the connection come up.

Worked example: same-subnet check for 192.168.0.100 and 192.168.0.101 #

The inputs, all from the example pair quoted for this installation — illustrative, not a required scheme:

  • Controller PC Ethernet address: 192.168.0.100, the controller side of the example pair
  • Operator PC Ethernet address: 192.168.0.101, the operator side of the same pair
  • Subnet mask on both PCs: 255.255.255.0, as quoted with the pair

The rule in words: two hosts talk directly, with no router between them, when their addresses masked by the same subnet mask produce the same network number.

The arithmetic:

  • Controller: 192.168.0.100 AND 255.255.255.0 — the mask keeps the first three octets and zeroes the fourth — gives 192.168.0.0
  • Operator: 192.168.0.101 AND 255.255.255.0 gives 192.168.0.0

Result: both lines land on 192.168.0.0, a single network.

Decision: matching results mean the pair connects directly — cable or switch, no router — and the connection target, rack and slot are the only settings left to make. The moment the two results differ, the PCs sit on different networks: correct the address or the mask, or confirm the site route, before touching anything in the operator project.

Verify in this order #

  1. Ping the controller's Ethernet address from the operator PC. No reply means the fault sits below WinCC — the rule behind why HMI programming software needs a ping reply to download — so fix the network before opening the project. See why HMI programming software needs a ping reply to download.
  2. Compare the connection's target address with the controller's current address. If that address changed during commissioning, the stale entry left behind produces the faults collected in HMI comms errors after a PLC IP address change.
  3. Open "Set PG/PC interface" and confirm the access point the connection uses names the Ethernet adapter. When STEP 7 goes online from the same PC, give the "S7ONLINE (STEP 7)" access point the same adapter, so engineering and runtime share one known path.
  4. Compare the configured rack and slot with the software controller's station configuration, value for value.
  5. Restart the runtime and read the connection status. Up with values arriving: finished. Up with values still bad: the network path is proven and the fault sits in the project — the second FAQ below says what to read. Still down: return to step 1 and leave the I/O configuration alone.

What to leave alone #

  • The ET200M link: never aim the operator connection at the PROFIBUS card's parameters, and never route client traffic through the I/O segment to reach the controller.
  • The STEP 7 project structure: the WinCC application added there is a container to configure, not a route; a configured but unreachable station behaves exactly like a missing one.
  • The network choice, once made: if you decide the operator station should run over PROFIBUS instead, that is the configuration in running a WinCC 7.0 PC runtime over a PROFIBUS card, and the Ethernet steps here do not apply.

Questions asked

Can the operator station connect over the PROFIBUS card instead of Ethernet?

Yes, but as a different configuration, not a variant of this one. The operator PC then needs its own PROFIBUS card, the PG/PC interface selects that card for the connection, and addressing follows the PROFIBUS segment rules. Choose it only where no Ethernet path to the controller PC exists; keeping client traffic off the I/O segment is the better default.

The connection is up but some values stay unread. Is that the same fault?

No. The moment the connection establishes, the network path is proven; values that stay bad point at the tags themselves. Check which connection each failing tag references, the data areas it reads, and that the blocks it reads exist in the controller's current program. Fix those in the project and leave the network alone.

Do both PCs have to be on the same subnet?

A direct link needs it; a routed network does not. Addresses that mask to the same network talk with no router between them. If the site network routes between the PCs, the connection runs over that route as long as the target stays the controller's reachable Ethernet address. The check only tells you which case you have.

Ping to the controller's Ethernet address fails. What does that rule out?

Everything above the network layer. With no ping reply, the fault is the adapter, the cable, the switch or VLAN, or the address itself, and no setting in the operator project can compensate for it. Work the network until the reply returns, then resume with the connection target, the PG/PC interface and the rack and slot.

Keep reading

  • Troubleshooting

    Fix WinCC Runtime That Connects to the PLC Only via TIA Portal

    The runtime PC's PG/PC interface is bound to the wrong network adapter, so WinCC Runtime has no path of its own until a TIA Portal online session brings one up. Open Set PG/PC Interface in Windows Control Panel, assign the PLC-facing adapter to the S7 access point, restart the runtime, and confirm with ping plus a live tag. If ping already works, check the access point, the connection configuration, and PLC access permissions instead.

    HMI and touchscreens

  • How-to

    Run WinCC 7.0 PC Runtime over a PROFIBUS card

    No panel-versus-PC switch exists: launch WinCC Runtime on the PC, but the PROFIBUS link only works after the card driver is installed, the PC interface points at that card, and the WinCC connection carries the PLC's station address, rack and slot — then a moving tag value proves the link.

    HMI and touchscreens

  • Troubleshooting

    Fix WinCC Professional runtime not connecting to the S7-1500

    WinCC Professional Runtime can start, load screens and raise no error while the HMI connection leaves through the wrong PC network adapter, because the access point selects the interface automatically. Disable that automatic option, assign the access point to the PLC-facing adapter in Set PG/PC interface, re-download the runtime and restart.

    HMI and touchscreens