How-to
Combining two migrated WinCC HMI projects in TIA Portal
Short answer
You cannot merge two migrated WinCC projects into one TIA Portal project automatically. Pick one project as the destination and move the complete HMI device from the other by copy and paste between two TIA Portal instances, by opening the source as a reference project and dragging it in, or through a global user library. The result is one project holding two separate HMI devices, not one merged device.
On this page
- What a combined project actually contains
- Prepare both projects
- Move the HMI device into the destination
- Reconnect the moved device to its controller
- Use a device proxy when the controller is engineered elsewhere
- Worked example: two migrated stations in one project
- The decision, case by case
- Questions asked
There is no merge command for two migrated WinCC projects in TIA Portal, so do not go looking for one. The supported way to combine them is to choose one project as the destination and move the complete HMI device out of the other project and into it: by copy and paste between two open TIA Portal instances, by dragging the device out of the View > Reference projects view, or through a global user library. The result is one project holding two separate HMI devices, each keeping its own screens, tags and texts; nothing at screen or tag level merges. For a pair of projects migrated out of the classic environment — SIMATIC Manager v5.5 SP4, for example — the whole job is one device move plus one connection repair for the moved device.
What a combined project actually contains #
The finished project holds two device entries in the project tree, not one merged station. Each HMI device arrives complete: its screens, its tag table, its text lists and its graphics. The two devices keep separate runtime settings and separate connections, so the combination lives at project level only. Plan for that result from the start: one archive to back up and one engineering environment to keep current, but two device entries to compile and download after every change. If the expectation is that the screens of two stations will end up on one device, reset it now — merging screens across devices is manual engineering, and the last section of this article puts a shape on that cost.
Prepare both projects #
Work on copies. Copy both migrated projects before you touch them and keep the originals untouched on another drive; consolidating the only copy in place leaves you no way back if a transfer goes wrong. It is the same discipline as any conversion: recover and secure the source before you restructure it, as the guide to recovering the project before converting lays out.
Both projects must already be TIA Portal projects, because copy, drag and library moves run between TIA projects only. Migrate anything still living in the classic environment first — the walkthrough for migrating a WinCC flexible project to TIA Portal covers the move and its version conditions. Then compile each migrated project clean, so the device you transfer is known-good.
Move the HMI device into the destination #
Run the move as one operation on the whole device entry — the top-level device in the project tree, never a scatter of individual screens:
- Open the destination project. Its own HMI device stays exactly as it is; this is the project that survives.
- Put the source project within reach by one of the three supported paths: a second TIA Portal instance, the
View > Reference projectsview, or a global user library that already holds the device. - Copy or drag the complete source HMI device, so its screens, tags and texts travel together.
- Paste or drop it into the destination project tree and let the tool copy the device with all of its contents.
- If the destination project already holds a device with that name, rename the arriving device — the machine it serves is a good name.
- Save and confirm the project tree now shows both devices.
| Path | Use it when | Watch out |
|---|---|---|
| Two instances, copy and paste | You want the shortest one-off move | Both projects are open at once, so paste into the destination tree, not the source |
View > Reference projects |
You want to work from one window and leave the source untouched | The reference opens read-only, so nothing edited there saves |
| Global user library | The device must be staged, reused, or carried to another engineering PC | The library holds a copy; re-copy it after the source changes |
Reconnect the moved device to its controller #
The moved device brings its screens and tags, but its HMI connection was a link to the controller inside its old project. The vendor procedure for copying devices with their HMI connections runs: open the Devices & Networks editor, connect the new HMI device to the required network, open the connection table, and select the HMI connection of the new HMI device to re-assign its partner. Until that link points at a controller in the destination project, the moved device's tags have no data source and its screens cannot go live. Treat the reconnect as part of the move, not a cleanup for later. If the controller itself lives in the destination project, connect to it directly in Devices & Networks.
Use a device proxy when the controller is engineered elsewhere #
A device proxy stands in for a controller that is not engineered inside this TIA project. The documented flow: double-click Add new device in the project tree and select the device proxy under the controller group; select the proxy in the network view and run Initialize device, which reads the controller data in from the controller's own project file; then, still in the network view, select HMI connection in the drop-down and drag one device onto the other, and the tool creates the HMI connection between them. If the controller is already integrated in the project, skip the proxy entirely and draw the HMI connection directly — a proxy adds nothing for a controller the project already knows.
Worked example: two migrated stations in one project #
Example numbers, not a measured project. Station A migrated with 34 screens and 412 HMI tags; Station B with 28 screens and 377 tags. Pick A as the destination and move B's device in through the reference projects view. The project tree then holds two devices: A keeps 34 screens and 412 tags, B keeps 28 screens and 377 tags. The arithmetic: 34 + 28 = 62 screens and 412 + 377 = 789 tags now sit in the project, but none of it pools. B's 377 tags still count against B's own per-device variable budget — the one described in the article on the variables-per-device limit in TIA Portal HMI — and A keeps its own totals. The project grew by the whole of Station B; no screen, tag or text merged or vanished. Bench check before deployment: compile both devices in the destination project, download each to its own panel, and exercise one screen per device against its live controller.
The decision, case by case #
- Two projects, controller already in the destination project: move the device by reference projects or copy-paste, then reconnect it in
Devices & Networks. Done. - Controller engineered in a separate tool: same move, then the proxy flow — add the device proxy, run
Initialize devicefrom the controller's project file, drag theHMI connection. - Name collision after the paste: rename the arriving device in the destination project and leave the source project on disk under its original name.
- Screens that must live on one device instead of two: there is no automatic path — plan that as a manual rework project.
- One terminal for both stations: not what consolidation delivers, because each device still downloads to its own panel. If the actual goal is fewer terminals at the machines, that is a station design question, and the write-up on how one spare HMI panel covers seven machines shows what one terminal carrying several projects looks like.
Questions asked
How do I undo a consolidation if I change my mind?
Delete the pasted HMI device from the destination project tree and fall back to your untouched original projects. This is why the move happens on copies: the original pair on the separate drive is the rollback, and nothing in the destination project depends on it. Panels already running keep running their current programs until you transfer something new.
Can I merge the screens of two HMI devices into one device?
No. The supported move is the complete HMI device, so its screens stay on that device. To end up with one device, open both projects, copy screens across one at a time, and rebuild the tags, text lists and connections each screen uses. Budget real engineering time for that rework; the device-level move is the fast, supported path.
What happens when both migrated devices have the same name?
A project cannot hold two devices with the same name, so rename the arriving one in the destination project. The machine it serves is a clear choice. Do the rename there, not in the source project, so the original on disk keeps its name and stays usable as your fallback copy.
Do the text lists and graphics of the moved device come along?
Yes. Moving the complete HMI device takes its screens, tags, text lists and graphics with it. Nothing merges with the destination device's texts: the project simply holds a second, independent set. Compile both devices after the move so a missing resource shows up at your desk instead of at the machine.
Does combining the projects put both stations on one panel?
No. After the move you still have two HMI devices in one project, and each downloads to its own panel. Running both stations from a single terminal is a separate design: rework one device's screens to serve both controllers and confirm its connection budget covers both. Count operator stations by the job each one has to do.