IMDTouchKnowledge BaseShop main store

How-to

Unified Comfort Panel image updates when two versions are needed

HMI and touchscreens Published 5 min read

Short answer

TIA Portal can hold only one installed panel image per major version and device type, so installing the V21 Update 2 image overwrites Update 1 on the engineering PC. Upgrade every affected panel to Update 1 first, then install Update 2, or extract image packages to separate folders and install them per panel through ProSave or USB.

On this page
  1. Why the conflict happens
  2. The two decisions, stated plainly
  3. Upgrade sequence
  4. What to check after the update
  5. Version discipline going forward
  6. Questions asked

TIA Portal can hold only one installed panel image per major version and device type, so installing the V21 Update 2 image overwrites Update 1 on the engineering PC. The decision is therefore a scheduling one: either install Update 1 on every affected panel before you install the Update 2 image on the PC, or extract the image packages to separate folders and install them per panel through ProSave or from a USB stick. Both paths get the same result; the first is cleaner for a fleet that can be taken down together, the second when panels must move through the stages individually.

Why the conflict happens #

An image is the panel's operating-software package; it is not the HMI application project. The image installed on the engineering computer and the image running on the panel are two separate states, and replacing the former does not advance the latter. For an image update launched from inside TIA Portal, only one image can be installed per major version and device type. That restriction saves disk space on the engineering PC and is not going away.

The practical failure is an upgrade sequence with a missing intermediate stage. The V21 Update 2 transition described here requires Update 1 to already be installed on the panel. If the PC already holds the Update 2 image, TIA Portal can no longer offer Update 1, and a panel still on the base V21 image has no path forward from the engineering station. Record the panel's installed image version before you touch the PC: open the panel's Control Panel, go to System Properties and then Panel Information, and read the Image version entry. If the PC has already been switched to Update 2, read the panel version first and see the HMI engineering software compatibility check article before committing to an upgrade order.

The two decisions, stated plainly #

  • All panels can be down at once: install the Update 1 image package on the PC, image every affected panel to Update 1, then install Update 2 on the PC and image the group again. One installed image per stage is enough because the whole fleet moves together.
  • Panels must upgrade one at a time: extract the packages without installing them. Copy each extracted image folder to its own clearly named location, then per panel select the right image through ProSave or install it from USB at the device. Extracting does not register the image in TIA Portal, so several versions can sit on the PC and on removable media at the same time.

Upgrade sequence #

Work through these steps for the V21 Update 2 path; the same order applies to other releases once you have confirmed their stated prerequisites in the package information.

  1. Back up before anything else. Save the HMI project and the panel's configuration data from every device in scope. An image update replaces the operating environment, and a machine that loses its application because the backup was skipped is a downtime event you caused. Keep the backup where a second person can find it.

  2. Read every panel's installed image version. Use System Properties and Panel Information on each device and write the value down. The result is a specific starting release per panel, not the project's TIA Portal version. Panels already on Update 1 skip the next panel-side step.

  3. Install the Update 1 image package on the engineering PC. The image setup installs the image files through its own wizard and requires a compatible TIA Portal installation. Obtain image packages from the manufacturer's support portal or authorized distribution channels only, and keep the package version recorded with your notes.

  4. Update every panel that needs the intermediate stage. Launch the image update from TIA Portal, or use the panel's own path: open the Control Panel on the device, select Service & Commissioning, then Update OS, and choose the storage medium holding the image. Confirm the image information shown before you start the transfer. When the panel restarts, re-read Panel Information and confirm it reports Update 1.

  5. Install the Update 2 image package on the engineering PC. Do this only after step 4 is complete for the group. The installation overwrites the previous image on the PC; that is expected, because the panels no longer need it.

  6. Apply Update 2 to each panel. Repeat the same update workflow, from TIA Portal or from USB. Expected result: Panel Information reports the target release after startup.

For panels that must be done individually while the PC is already on Update 2, extract the Update 1 package instead of installing it in step 3. The extracted package contains a folder named UCP_7_22 with the image data. Copy that complete folder to a separate, clearly labeled location and leave the contents untouched; renaming the folder for your own bookkeeping is fine. Select the image from that folder in ProSave, or put it on a USB stick and use the panel's Update OS screen. In that case see how to verify the HMI project version running on a panel after the update, because a device done out of band is the one most likely to drift from the rest of the fleet.

What to check after the update #

A completed transfer is not acceptance. Read Panel Information after restart and confirm the intended release, not just that the panel boots. Restore or download the HMI application as the procedure requires and confirm it starts without a compatibility error. Then put representative HMI values next to live controller values on a bench or during a controlled stop and confirm they track: an image update can settle the operating system and still leave a deployment or connection problem behind. Only a matching image version, a running application and live controller values together return the panel to service.

Version discipline going forward #

The image download collection covers V21, V20, V19 and V18, but a package being present in the collection does not define an upgrade path; each release transition has its own stated prerequisite, and for V21 Update 2 that prerequisite is Update 1. From V21 Update 2 onward, Service Releases are also offered as fix-only packages released independently of the regular updates; read their prerequisites before scheduling them. Before your next rollout, decide which of the two workflows above your fleet uses and stick to it, so no panel is ever left on an intermediate release the installed PC image can no longer reach.

Questions asked

How do I read the image version installed on a Unified Comfort Panel?

Open the Control Panel on the panel and go to System Properties, then Panel Information. The Image version entry shows the release the device is running. Record it per panel before you choose an image package, because the panel's running image and the image installed on the engineering PC are two independent states and the project's TIA Portal version is not the panel's image version.

Does renaming the extracted image folder change the image?

No. A copied, renamed folder still contains the same image for the same device type and release. Renaming is only an administrative aid so you can tell Update 1 and Update 2 folders apart. Keep the complete extracted contents together and record which download package each folder came from.

What is a Service Release for Unified Comfort Panels?

From V21 Update 2 onward, Siemens offers Service Releases for Unified Comfort Panels in addition to the regular TIA Portal updates. A Service Release contains only error fixes and quality improvements and is released independently of the regular update cycle. Read its applicability and prerequisites before scheduling it, because it does not replace the update path described here.

Keep reading

  • Troubleshooting

    Why Installing WinCC Flexible Breaks TIA Portal V13

    No — TIA Portal V13 does not bundle WinCC Flexible; the Root Screen editor you already opened is its integrated WinCC editor, and that is where KTP panels are engineered. WinCC Flexible 2008 is the separate previous-generation tool, and installing it on the V13 machine is what stops TIA Portal starting, so uninstall it, run the V13 repair, and keep the two tools on separate machines or migrate the project.

    HMI and touchscreens

  • Troubleshooting

    TIA Portal shows no HMI option: install WinCC Engineering

    WinCC Runtime Advanced only executes HMI projects; it cannot create them. TIA Portal shows no HMI device option until the matching WinCC engineering package (Basic, Comfort/Advanced or Professional) for your TIA Portal version is installed and licensed. Reinstalling the runtime does nothing.

    HMI and touchscreens

  • Comparison

    WinCC Explorer vs Advanced, Professional, Flexible and Unified

    WinCC Explorer is only the project shell of WinCC Classic, the pre-TIA Portal PC SCADA system. Advanced and Professional are TIA Portal products — Advanced for panel-style visualization and Runtime Advanced on a PC, Professional for data-heavy PC SCADA — Flexible is Advanced's out-of-date predecessor, and Unified is the web-based generation on Linux-based panels. For a new S7-1200 SCADA, engineer it in TIA Portal as WinCC Professional or Unified; the S7-300 SIMATIC Manager plus Explorer path does not carry over.

    HMI and touchscreens

Why the PDF button does nothing on a Unified Comfort panel