Short answer
A 2-3 s lag on one WinCC Professional field is almost never the S7-1500 link or the runtime PC. It is the refresh cycle set on that field's tag reference. Open the screen, right-click the background, open the Dynamisation overview, and set the cycle each I/O field and animation actually needs; only widen the search to acquisition and communication when the PLC value itself arrives late in the runtime.

On this page
A field on a WinCC Professional V15.1 runtime screen that follows its S7-1500 value 2-3 s late almost never has a communication cause. The delay usually sits in the refresh cycle configured on that specific tag reference — the I/O field or animation that displays the tag. WinCC refreshes every reference on its own cycle, so one field can lag while the runtime already holds the current value. Work through the checks in order: confirm the source value, read the reference cycles in the Dynamisation overview, separate presentation from acquisition, then set each reference to the cycle its indication needs. Change communication settings only when the checks point at acquisition.
Why one field lags while the link is healthy #
Three stages sit between a process change and a new number on the screen. The PLC writes the value. The runtime acquires it across the connection, on the tag's acquisition settings. Each object that shows the tag then presents it, on the refresh cycle of that reference. A multi-second lag with smooth screen operation lives in the presentation stage or occasionally the acquisition stage; the PLC stage is rare. Siemens documents a screen cycle for WinCC RT Professional that decides how often a screen refreshes and can trigger every dynamization in the screen together, while the cycle on the individual reference decides how promptly one field follows.
Three neighbouring symptoms are not this one. If every point on the link slows at once, that is acquisition, and the fixes live in Why HMI point updates run slow on an Ethernet PLC link. If values from a remote I/O drop lag the head controller, that is the case in Why WinCC tag updates run slow on an IM 151-7 PROFIBUS link. A screen that takes seconds to open or swap is navigation, covered in Why WinCC RT Professional clients change screens slowly.
Confirm the source value first #
- Pick one affected variable whose transitions are slow and unambiguous; a value that flips every few hundred milliseconds makes visual timing unreliable.
- Watch it online in the PLC engineering tool and confirm it changes when the process or test condition changes.
- Watch the matching field on the runtime at the same moment, over several changes.
- Note whether the delay is repeatable, intermittent, or tied to one particular screen.
If the PLC value itself changes late, the logic that produces or copies it is the fault — fix it there before touching the HMI. If the PLC is prompt and the field follows seconds later, the presentation or acquisition side is the suspect.
Read the cycle on every reference #
A tag reference is one use of a tag by one object. The same tag can appear in several references on a screen, so matching by tag name is not enough; inspect the objects that actually show the delay.
- Open the affected screen in the project.
- Right-click the screen background and open the Dynamisation overview.
- Locate each reference behind the delayed I/O fields and animations.
- Read the refresh cycle set on each of them, plus one reference that responds promptly as a comparison.
- Expected reading: the delayed references carry a slower cycle than the responsive ones, often a slow default nobody chose deliberately.
A slow cycle on a delayed reference is the fault, and the correction below is the fix. A cycle already faster than the observed delay means presentation is not the cause — move to the acquisition check instead of shortening the cycle again.
Why a cyclic update looks intermittent #
Cyclic updates explain both the size and the variability of the delay. Worked example with illustrative settings — read what the project actually sets: assume the tag is acquired every 2 s and the reference refreshes every 2 s. A value that changes just before a refresh appears immediately; one that changes just after waits nearly the full interval. Average wait per stage: 2 s ÷ 2 = 1 s. Worst case per stage: 2 s. The two cyclic stages sit in series, so the average observed delay is 1 s + 1 s = 2 s and the worst case is 2 s + 2 s = 4 s. A fixed configuration therefore shows up as an intermittent 2-3 s symptom, exactly the reported pattern.
If the tag is acquired when the value changes rather than on a cycle, drop the acquisition stage and halve the estimate. A healthy Ethernet exchange itself completes in tens of milliseconds, so the network cannot supply seconds of latency. And if the reference already refreshes at a fast interval — for example the 100 ms class — presentation adds at most 0.1 s, so any remaining multi-second gap points at acquisition or the source value. The arithmetic bounds the wait; it does not prove which stage is slow, which is what the overview in the previous section reads directly.
Separate presentation from acquisition #
| Observation during the delay | Meaning | Next step |
|---|---|---|
| One reference lags while another reference to the same tag follows promptly | Presentation side — that reference's cycle | Shorten the slow reference's cycle |
| The runtime holds the current value but the field stays static | Acquisition is ahead of presentation | Correct the object's dynamization cycle |
| Many unrelated values arrive late in the runtime together | A shared acquisition or connection constraint | Connection diagnostics and the tag acquisition settings |
| Values and screen interaction pause together | Runtime workload on the PC | Watch processor, memory and storage while it happens |
For the third row, check connection diagnostics for reconnects or errors while reproducing the delay. The fourth row is the only case where the runtime PC's resources become the suspect; observe them during the event rather than inferring performance from the specification sheet.
Set the cycle each indication needs #
- Record the current cycle of every reference you intend to change so the edit can be reversed.
- In the Dynamisation overview, set the faster documented cycle on each reference that needs a faster indication — for example a 100 ms interval on a live control value — and leave unrelated references unchanged for the first test.
- Choose by need: operator-facing live values get the fastest option; slowly changing status indications can stay slower to keep the runtime light.
- Compile, deploy, and confirm the runtime is running the updated project before repeating the timing comparison — a test against a stale runtime measures the old configuration.
Shortening many references adds rendering work in the runtime, while the traffic on the link follows the tag acquisition settings, not the display cycle; where the broader question is tag volume on an Ethernet link, HMI tag arrays and communication load over Ethernet covers that side. Prove the change against a verified test tag during a planned stop or on a bench runtime before trusting the screen on a live line — an operator acting on a screen that lagged unnoticed is the hazard this fix removes.
The decision for each case #
- PLC value itself late: the producing or copying logic in the PLC is the fault; no HMI setting helps.
- PLC prompt, one reference lags, slow cycle found in the Dynamisation overview: set that reference's cycle to what its indication needs — resolved per reference.
- PLC prompt, reference cycle already fast, runtime value late: the acquisition side — connection diagnostics and the tag acquisition settings.
- Values and screen operation pause together: runtime workload on the PC.
- Only the values from a remote I/O drop are late: the remote-I/O link, as in the PROFIBUS article linked above.
Questions asked
Does shortening the display cycle add traffic to the S7-1500 link?
No. The reference cycle only decides how often an object redraws a value the runtime already holds. How often the value is fetched follows the tag's acquisition settings and the connection, so a faster display cycle adds rendering work in the runtime, not polling traffic on the network. Link load only rises when acquisition settings or tag counts change.
Can two fields on the same screen run at different cycles?
Yes. The cycle belongs to the reference, not to the screen or the tag, so a live control value and a slowly changing status on the same screen can each have their own interval. Set each one to the response its indication needs and leave the rest as they are.
What if the response I need is not among the built-in cycles?
The project's cycle settings include an editor for user-defined intervals. Define the interval there once and it appears in the same cycle lists where a reference is assigned its cycle, so an unusual response requirement does not have to inherit a built-in value that is too slow or unnecessarily fast.
When is the runtime PC the problem instead of the project?
Only when the pause hits everything at once: values, alarms and screen operation stop together for a moment. Then watch processor, memory and storage activity while reproducing the delay. A fixed lag on single fields that leaves screen operation smooth is a configuration symptom and is resolved in the project, not in the hardware.