Yes, a LOGO! 8.2 can serve LOGO! Web Editor pages and talk to a TP700 Comfort panel at the same time: the controller has one Ethernet port, so the panel, the controller and the browser PCs all sit on one Ethernet switch; you need LSC V8.2 to build the pages, web server access enabled on the controller, and the pages loaded as one web project.

On this page
  1. One port, two kinds of client
  2. Versions the Web Editor requires
  3. The switch and a worked address plan
  4. Enabling the web server and loading the pages
  5. What runs on the wire during operation
  6. Commissioning checks
  7. Questions asked

Yes, the two coexist. A LOGO! 8.2 can serve a LOGO! Web Editor (LWE) project and talk to a TP700 Comfort panel at the same time, because the only hard limit is physical: the controller has one Ethernet port, and one socket takes exactly one cable. The fix is an Ethernet switch — the LOGO!, the TP700 and the browser PC each take one port on it. On top of the wiring, the Web Editor needs three conditions met: LOGO! 8.2 firmware with the extended web server, LOGO! Soft Comfort V8.2, and web server access enabled on the controller. What follows is the version check, the topology with a worked address plan, the load procedure and the commissioning checks.

One port, two kinds of client #

An Ethernet interface with one socket is not limited to one conversation. The TP700 Comfort holds a configured driver connection to the controller and polls its tags cyclically, while every browser session sends its own HTTP requests to the integrated web server. These are separate TCP connections arriving on the same interface, and the controller serves them side by side — nothing in the LOGO! makes the panel and the web server exclude each other.

What the single socket cannot do is carry two cables at once. The switch resolves that: each device gets its own cable and its own switch port, and the switch forwards frames between the ports. Because everything stays in one subnet with no routing, an ordinary unmanaged industrial Ethernet switch is sufficient; no managed feature takes part in this design.

Versions the Web Editor requires #

Check three things before building pages:

  • Controller. The Web Editor needs LOGO! 8.2 firmware with the extended web server. A 0BA8 unit in the FS04 to FS06 range still on V1.81.03 or lower does not support it, so read the firmware version in the engineering tool's online view and update the controller first. Update with the process stopped: the controller restarts during a firmware update.
  • Engineering software. LOGO! Soft Comfort V8.2 runs on Windows, macOS and Linux and includes the Web Editor, so there is no separate editor installation to keep in step.
  • Panel side. The TP700 Comfort project is built and downloaded with TIA Portal, and its controller connection is the normal configured connection to the controller's IP address.

The switch and a worked address plan #

Count ports before choosing the switch. Devices that need one in this design: the LOGO!, the TP700 Comfort and the engineering PC that runs the browser — three cables. On a 5-port switch, 5 - 3 = 2 ports remain, enough for an uplink to the plant network with one spare (5 - 4 = 1). The panel holds its port permanently, so nothing is shared or re-patched.

Set the addresses statically in one private subnet. An example plan:

  • LOGO!: 192.168.0.1, subnet mask 255.255.255.0
  • TP700 Comfort: 192.168.0.2
  • Engineering PC: 192.168.0.3

The mask is a /24, so the subnet spans 256 addresses, of which those from .1 to .254 are usable once the network and broadcast addresses are set aside; all three devices sit inside it and no router takes part. In a browser, the LOGO!'s address opens the integrated web server, and because HTTP defaults to port 80, no port number belongs in the address. The controller's address is assigned from LOGO! Soft Comfort's Ethernet settings and downloaded with the program; the LOGO! side of that is walked through in connecting a LOGO! 0BA8 to an MT8050iE HMI over Ethernet.

Enabling the web server and loading the pages #

Web server access is off until it is switched on, and the pages go onto the controller as one unit:

  1. In LOGO! Soft Comfort, open the controller's online settings: on the "Online Settings" tab select "User profile setting", then under "Webserver access" check "Allow Webserver access".
  2. Build the custom pages in the integrated Web Editor against the controller's tags.
  3. Load the pages onto the LOGO! as one overall web project. There is no single-page load: the set on the controller is replaced whole, so keep every page someone uses inside the project.
  4. Open the integrated web server in a browser and confirm the custom pages appear.

If the pages must show the controller's message texts, that part has its own procedure, covered in displaying message text in LWE custom web pages.

What runs on the wire during operation #

With one panel and a few browser sessions, the load on a switched link like this is light, and the clients do not interfere: the panel's driver polling is a steady cyclic load, while the web server answers each browser as its requests arrive. A value changed at the panel shows on a web page at that page's next update — the same controller data stands behind both views.

The pages are ordinary web content, so anything that can route to the controller's address can display them: a plant network, a VPN or a cellular router. Reading them away from the machine is covered in accessing LOGO! LWE pages remotely via 4G LTE. Keep the controller's web server on the machine network or behind that tunnel, and do not forward its port from the open internet.

Commissioning checks #

Bring it up in this order:

  • Ping the controller's address from the engineering PC; a reply confirms the switch, the cable and the address plan.
  • Open the integrated web server in the browser and confirm the custom pages appear and their values follow the live process.
  • Operate the TP700 while the browser refreshes: the panel keeps updating, and a setpoint change made at the panel shows on the page at its next update.
  • Download the TP700 project over the same switch; if that download fails although the panel answers ping, the causes are listed in why a TP700 Comfort download fails 0132:000002 despite ping.

When the panel shows live values and the browser shows the same values at the same time, coexistence is proven for this machine and no further network work is needed.

Questions asked

Does LOGO! 8.3 change this arrangement?

No. The LOGO! 8.3 software download includes the improved LOGO! Web Editor V1.1.0 with cloud options, but the controller still has one Ethernet port, so the switch, the address plan and the panel connection stay as described. A project built with the V8.2 tools continues in the newer software, so the network plan survives the upgrade.

Is the newest engineering software alone enough for the Web Editor?

No. The controller firmware decides as well: a 0BA8 in the FS04 to FS06 range on V1.81.03 or lower has no extended web server, so the pages will not run there regardless of the software version on the PC. Update the controller's firmware above that point first, then load the web project onto it.

Do the LWE pages replace the TP700 screens?

No, and they should not be built as a copy of them. The panel is the local operating station mounted at the machine, available without any browser; the web pages serve engineering and remote checks from whatever device can reach the controller. Both read the same controller data, so keep the panel as the primary interface and put on the web only what someone needs away from the machine.

What changes on the TP700 side to make this work?

Nothing beyond a normal setup. The panel's project keeps its configured connection to the controller's address, the web project never enters the panel's configuration, and no driver setting changes. The only resource the panel shares is the switch, where it occupies its own port continuously, which is why the coexistence costs no configuration effort on the HMI side.

Keep reading

  • Troubleshooting

    Why a Comfort Panel IP Reverts to 0.0.0.0 After Power Cycle

    The panel is losing its stored network settings at cold start because the settings area on its internal flash is damaged. Repair it with an OS update run with reset to factory settings selected, re-enter the fixed address on the panel, then prove it with a 30 s power-off. Measure the 24 V supply first and correct it if the reading falls outside 19.2 to 28.8 V.

    HMI and touchscreens

  • Troubleshooting

    When VNC works but HMI project upload fails over Ethernet

    A VNC session proves only an IP path to the panel's viewer service; it says nothing about the engineering transfer service the upload tool needs. Read the panel's real address, put the PC in that subnet, test LAN1 and LAN2 separately, then check adapter selection and the panel-side transfer enable. Copy the project to USB before any firmware recovery.

    HMI and touchscreens

  • Explainer

    Viewing a Vision Camera Image on a Comfort Panel HMI

    A Comfort Panel has no video decoder, so the FQ2 image reaches the panel as a web page: enable the camera's built-in web server, display that page in the panel's browser object on a 1 to 2 second reload, and pass fail judgments through PLC tags. Continuous live tuning belongs on a PC running the vendor's setup software.

    HMI and touchscreens