Selection guide
When your HMI needs more than the bundled communication license
Short answer
Since WinCC V6.0 SP3, every RT/RC license bundles a SIMATIC NET S7-Softnet Lean license for 8 S7 connections (10 from WinCC V8.1); Client licenses bundle none. Above that limit, Industrial Ethernet SOFTNET-S7 covers 64 and Extended 128, and from WinCC V7.5 SP2 the bundled key upgrades with a regular Powerpack. Count configured connections and inventory the keys before ordering.

On this page
- Does the WinCC runtime license include the S7 communication license?
- How many S7 connections does the bundled Lean license cover?
- Which license do you need for 64 or 128 S7 connections?
- Can you upgrade the bundled Lean license with a Powerpack?
- What happens to the Lean license when you upgrade WinCC?
- Where must the communication license be installed?
- How do you count connections and check the installed keys before you order?
- Questions asked
The communication license that ships inside a WinCC RT/RC package is real, but it is small. Since WinCC V6.0 SP3 every RT/RC license includes a SIMATIC NET S7-Softnet Lean license for up to 8 S7 connections over ordinary Ethernet adapters, while Client licenses include none. Past that connection limit you need Industrial Ethernet SOFTNET-S7 (64 connections) or its Extended variant (128 with WinCC V7), and from WinCC V7.5 SP2 a regular license Powerpack carries the bundled Lean key there instead of a full package. Here are the tiers, the release boundaries and the count-before-you-order procedure.
Does the WinCC runtime license include the S7 communication license? #
Yes — since WinCC V6.0 SP3, every WinCC RT/RC license package includes a SIMATIC NET S7-Softnet Lean license, the communication entitlement the runtime needs to build S7 connections over Industrial Ethernet.
The two licenses answer different questions on one machine. RT or RC licenses the HMI application itself; the SIMATIC NET key licenses the PC communication software that carries the S7 Ethernet process connections. Neither proves the other, so a licensed runtime can still be missing its communication entitlement, and a communication key can sit on a machine with no runtime license. TIA Portal plants run into the same separation from the other side when they ask whether a WinCC Professional entry means SCADA runtime is installed: installed software and licensed capacity are separate facts there too.
How many S7 connections does the bundled Lean license cover? #
The bundled Lean key covers up to 8 S7 connections, and from WinCC V8.1 the same key covers 10; the connections run over ordinary Layer 2 Ethernet adapters, including the CP1612 card and the Industrial Ethernet interfaces integrated in SIMATIC industrial PCs.
The adapter is not the license. A CP1612, an integrated Industrial Ethernet interface and any standard Layer 2 Ethernet card all draw on the same key, so swapping network cards never moves the connection limit by a single connection — the limit lives in the key. What the key counts is configured connections, not controllers: plan with the station list, decide with the connection list, because the license has to cover what the WinCC configuration actually sets up, and the vendor's licensing FAQ states the lean entitlement by connection partners.
Which license do you need for 64 or 128 S7 connections? #
Above the lean capacity, Industrial Ethernet SOFTNET-S7 covers up to 64 S7 connections, and Industrial Ethernet SOFTNET-S7 Extended goes higher, with a 128-connection arrangement documented for WinCC V7; WinCC's own technical data still caps what a single runtime can operate, and the communication package never raises that ceiling.
| Package | Documented capacity | Keys shown in Automation License Manager | How you get there |
|---|---|---|---|
| SIMATIC NET S7-Softnet Lean (bundled) | Up to 8 S7 connections, 10 from WinCC V8.1 | Industrial Ethernet SOFTNET-S7 LEAN + Industrial Ethernet SOFTNET-S7 Basic | Included with every RT/RC license since V6.0 SP3 |
| Industrial Ethernet SOFTNET-S7 | Up to 64 S7 connections | LEAN + Basic + Industrial Ethernet SOFTNET-S7 Power Pack | Full package, or a Powerpack on an eligible base key |
| Industrial Ethernet SOFTNET-S7 Extended | 128-connection arrangement with WinCC V7 | LEAN + Basic + Industrial Ethernet SOFTNET-S7 Extended | Verify WinCC's connection ceiling alongside the package |
What you bought and what the license manager shows are different things. The lean package is not one key but two: Industrial Ethernet SOFTNET-S7 LEAN plus Industrial Ethernet SOFTNET-S7 Basic. The standard package adds Industrial Ethernet SOFTNET-S7 Power Pack on top of those two, and the Extended package carries Industrial Ethernet SOFTNET-S7 Extended alongside them. These keys are the constituents of one package, and the package's capacity belongs to the package. For the vendor-side detail on what each key covers, a comparison of the basic, lean and full SOFTNET-S7 connection tiers walks through them key by key.
Can you upgrade the bundled Lean license with a Powerpack? #
Only from the right release: version-bound Lean keys delivered from V6.0 SP3 up to the first V7.0 packages were upgradeable with a same-version Powerpack, the version-independent keys that followed are Powerpack-eligible from WinCC V7.5 SP2, and every release in between needs the full package.
A Powerpack is an upgrade to an existing key, not a license on its own; with no eligible base key on the machine it entitles nothing. The routes:
| Your Lean key arrived with | Route above the lean capacity |
|---|---|
| WinCC V6.0 SP3 to the first V7.0 packages (version-bound) | A matching-version license Powerpack was the upgrade route |
| WinCC V7.0 SP2 through V7.5 SP1 (version-independent) | Full Industrial Ethernet SOFTNET-S7 package — or upgrade WinCC to V7.5 SP2 first, then a Powerpack |
| WinCC V7.5 SP2 or later | A regular license Powerpack, with the bundled Lean key as the base |
The last row reverses the older rule, and the reversal is recent: the vendor's licensing FAQ cleared the version-independent Lean key as a Powerpack base above the lean limit only in its 2025 revision, so internal licensing notes written earlier describe a route that no longer applies. Powerpacks behave the same way elsewhere in WinCC licensing — how Powerpack licenses resolve the WinCC tag logging 512-tag limit shows the pattern on the archiving side. Decision: on V7.5 SP2 or later, order one Powerpack and nothing else; on V7.0 SP2 through V7.5 SP1, order the full package or move the WinCC upgrade ahead of the purchase.
What happens to the Lean license when you upgrade WinCC? #
RT/RC upgrades to V6.2 through V7.4 deliver another Lean license, upgrades to V7.5 deliver none because every eligible source version already supplied one, and a version-independent Lean key stays valid with the SIMATIC NET release the new WinCC version requires.
This is where the two key types part ways in a migration budget. A version-bound key from the V6 era needed a SIMATIC NET upgrade license alongside the WinCC upgrade whenever the newer runtime required a newer communication software version. The version-independent keys delivered from V7.0 SP2 remove that line item — the vendor states you no longer need SIMATIC NET upgrade licenses for them — so the same Lean key follows the project forward. Version independence is still not blanket compatibility: which SIMATIC NET PC Software release you install is dictated by the compatibility list for your WinCC version, and that software question gets settled before the license question.
Where must the communication license be installed? #
On the computer that hosts the S7 process connections — the server or the single station — never on a pure client: WinCC Client licenses never included a Lean key, and a client that only displays server data builds no S7 connections of its own.
In a client-server system, the server's key inventory decides whether you are inside or past the lean capacity. If a client is configured with its own direct S7 connections to controllers, that computer needs its own communication entitlement, because nothing in the Client license covers it. Count each computer separately: two computers with five configured connections each sit inside their own lean capacity, while one computer with ten configured connections is past it on every release before WinCC V8.1.
How do you count connections and check the installed keys before you order? #
Inventory the keys in Automation License Manager, count the configured S7 connections in the WinCC connection overview, and compare the two numbers; ordering on the strength of the WinCC license alone is how plants buy twice.
Automation License Manager is the vendor's tool for installing and uninstalling license keys, and it lists every constituent key of a package separately, so write all of them down — LEAN, Basic, Power Pack, Extended — not just the first line. Then work through this list:
- Record the WinCC version and service pack on the computer; it sets both the lean capacity and the upgrade route.
- Establish whether the Lean key is version-bound or version-independent; keys bundled from V7.0 SP2 onward are version-independent.
- Count the configured S7 connections in the WinCC connection overview where the S7 communication partners are set up, one per configured connection to a partner.
- Compare the count with the lean capacity: inside it, order nothing, and treat any connection problem as a network or configuration fault to diagnose, not a license to buy.
- If a replacement runtime computer is planned, transfer every constituent key with the package; a package missing one key is incomplete, which belongs on the same checklist as what a spare HMI PC needs before the old runtime PC fails.
Worked example. A plant runs WinCC V7.5 SP2 on one server with 6 configured S7 connections: five S7-300 stations and one S7-400. An extension adds eight S7-300 stations at one connection each, so 6 + 8 = 14 configured connections — 14 − 8 = 6 above the bundled capacity. The server's Lean key arrived with V7.5 SP2, so the Powerpack route applies: order the Powerpack that completes the standard package, leaving 64 − 14 = 50 connections of headroom, and buy no full package.
Run the same fourteen connections on a V7.3 server and the version-independent key is not Powerpack-eligible: there the decision is the full standard package now, or the WinCC upgrade to V7.5 SP2 first and only the Powerpack after — take the second route when that upgrade is already planned. Do not stage the new stations on unlicensed connections while an order is pending; the runtime is the operator's window on the machine, and losing process connections mid-shift removes that window while the plant keeps running.
Questions asked
Can I add the LEAN, Basic and Power Pack keys together as separate connection pools?
No. They are the constituents of one package: LEAN and Basic form the lean entitlement, and the Power Pack key on top of them completes the standard package. Automation License Manager lists each key so you can audit and transfer the package, not because every key carries its own connection count. Adding them up invents capacity that was never sold.
Is SIMATIC NET PC Software V17 SP1 a new license version I have to buy?
No. The vendor released V17 SP1 as a direct, functionally compatible replacement for V17, so a license that covers V17 carries over and no new key is needed. What you still take from the compatibility documentation is which SIMATIC NET PC Software release your WinCC version supports, so keep software-version questions separate from license questions.
What do WinCC RT and RC mean?
RT is the runtime-only license and RC covers runtime plus configuration, so one RC key lets the same installation operate and be engineered. Both package types carry the bundled Lean communication license from V6.0 SP3 onward; the Client license does not, which is why a server's key inventory lists a SIMATIC NET key that a client's inventory lacks.
Why did the Powerpack rule change at WinCC V7.5 SP2?
Because the version-independent Lean keys were a dead end as delivered: bundled with every RT/RC package from V7.0 SP2, they could not be upgraded, so any project above the lean limit bought a full package and shelved the bundled key. Approving regular Powerpacks from V7.5 SP2 makes the bundled key the upgrade base, so those projects order one Powerpack instead of a full license.


