Explainer
Why one HMI cannot watch twelve LOGO controllers at once
Short answer
Twelve LOGO! 8 controllers exceed a KTP400 Basic's documented four controller connections, so one Basic panel cannot watch them all: 12 ÷ 4 = 3 panels. One shared screen needs a panel rated for sixteen controller connections used directly, or one collector LOGO! holding the twelve inbound links behind a single connection to the display; the eight-analog-input figure is per-controller wired I/O and never limits alarms crossing Ethernet.
On this page
Twelve LOGO! 8 boiler controllers and one screen is a connection-count problem, not an analog-input problem. A KTP400 Basic documents four connections to controllers, so twelve controllers need three of those panels — full coverage, but three screens instead of one. A single shared screen needs either a panel whose documented connection count reaches sixteen, or one aggregation LOGO! holding the twelve inbound links behind a single connection to the display. The eight-analog-input figure that started the debate is wired I/O per controller and never limits alarms crossing Ethernet. Below are the documented numbers, the arithmetic and the decision for each build.
The two budgets that get confused #
An analog input is a wired channel that turns a 4–20 mA signal into a number inside one controller. An HMI connection is a communication endpoint a panel holds toward controllers. The two live in different places — one on the controller's terminal board, one in the panel's connection budget — and counting one says nothing about the other. Collecting twelve alarms into two extra LOGO!s because eight is less than twelve applies the wired number to networked data: alarm states crossing Ethernet are discrete bits and consume no analog channels on any device.
The local control side checks out while you are there. Each boiler's LOGO! carries two 4–20 mA sensor loops and six heating-element outputs, and with expansion modules a LOGO! tops out at 24 digital inputs, 8 analog inputs, 20 digital outputs and 8 analog outputs. This boiler sits at two of the eight analog inputs and six of the twenty digital outputs — comfortable margin, identical on every unit. Local control was never the constraint. Supervision is.
What the documentation allows #
- Basic-class panels, the KTP400 Basic among them: four connections to controllers. The belief that such a panel reaches only one LOGO! at a time undersells it; four is the documented figure.
- Comfort-class panels: up to sixteen controller connections.
- A LOGO! 8 exchanging data with other LOGO! controllers: sixteen connections in the controller network, split eight static and eight dynamic.
None of these numbers mentions analog channels, because none of them is an analog-channel limit. A second caution belongs here: a driver listed for a pairing is not a proven connection. Configure the exact panel model against the exact LOGO! 8 generation and firmware in the engineering tool before sizing the cabinet, and hold third-party panels to the same test — a LOGO! entry in a driver catalog does not guarantee a live link, which is what the why an EasyBuilder Pro simulator fails to connect to a LOGO! OBA8 case demonstrates.
The arithmetic for twelve controllers #
Direct connection on the Basic class: 12 controllers ÷ 4 connections per panel = 3 panels, with 3 × 4 = 12 connections fully used. Coverage is complete and every controller stays directly reachable, but the plant gets three operator screens, so this build cannot meet the one-screen requirement no matter how the screens are arranged.
One sixteen-connection panel: 12 of 16 connections used, 4 spare for a thirteenth boiler or a second line. This is the only direct build that answers the question as asked — one screen watching every controller.
Aggregation: a collector LOGO! joins the twelve-controller LOGO! 8 network and holds 12 of the sixteen controller-to-controller links, 4 spare. The screen then consumes one connection — one of the four on a Basic-class panel — and the collector must expose every boiler's tags through that single link. Capacity passes on both sides: 12 ≤ 16 inbound, 1 ≤ 4 at the screen. Tag exposure across a LOGO! network project is a configured property, so prove one boiler's tag through the collector before replicating the pattern eleven times.
Alarm bits, not milliamps #
Fix the payload before the architecture. If the operator must know which boiler is faulted, one summary bit plus two cause bits per boiler — sensor fault and over-temperature — is 12 × 3 = 36 discrete points, traffic an Ethernet link absorbs without notice and zero analog channels anywhere. If diagnosis matters, add the two measured temperatures per boiler as numeric tags: 24 values, still no analog hardware at the panel. Give every boiler a validity bit so a frozen value can be told from a live one, and configure the display to mark a lost controller offline instead of showing its last reading.
One safety note: each boiler's over-temperature protection stays in its local control loop and local hardware. The supervisory screen, its connection budget and the Ethernet link are operator aids and never belong in a protective path.
Three builds and the decision #
| Build | Connections used | One shared screen? | Decision |
|---|---|---|---|
| Three KTP400 Basic panels | 3 × 4 = 12 | No — three operator screens | Take it when the plant accepts three stations; every controller stays directly reachable |
| One Comfort-class panel | 12 of 16 | Yes | The direct answer when one screen must watch every controller |
| One collector LOGO! plus one panel | 12 of 16 inbound; 1 to the screen | Yes, after the tag-exposure proof | Take it when the controller network already exists or the panel must stay Basic-class |
| Two TDEs over two collectors | — | No — two local text screens | Drop it; it was sized by a wired analog figure that does not apply |
Case by case. If the plant accepts three operator stations — one per wall, for example — the three-panel build is the simplest and fully direct; running several panels against one set of controllers raises configuration questions of its own, covered in connecting two HMI panels to control one machine. If the requirement is literally one screen, the Comfort-class panel is the decision: twelve of sixteen connections, no intermediate device, one project.
If a LOGO! 8 network already exists or the panel must stay in the Basic class, build the collector: twelve inbound links inside the sixteen-link budget, one screen connection, and a proven tag path before rollout. That collector runs two communication roles at the same time — many peer links inbound, one panel link outbound — the same arrangement as how a PLC runs two Modbus networks at the same time. And if a future expansion outgrows the sixteen-connection panel class, the same visualization moves to PC runtime software, with the machine-side computer then being one of the industrial panel PCs, its connection count coming from the runtime license rather than a panel class.
The rejected build stays rejected: two TDEs, the LOGO! text displays, give two local text screens at two cabinets, which is not the single shared overview, and sizing them by an analog-input count was the original error.
Bench checks before rollout #
Assign every controller a unique address and identity, build one boiler's complete tag set — two temperatures, summary bit, two cause bits, validity bit — and watch one real tag travel from controller to screen. Replicate the pattern across the remaining eleven with only address and identity changed, so a new boiler cannot overwrite a neighbor's data. Then prove it on a bench or in a maintenance window: force one harmless test alarm per boiler and confirm it lands under the right identity; pull the link on one controller and confirm that boiler shows offline, the others keep updating, and its local control loop never dropped. Sizing a screen by its connection count before purchase is the same exercise as counting HMI device connections for an extrusion machine upgrade, and one panel serving many controllers is a proven pattern elsewhere — a PanelView Plus displaying tags from five PLC-5 processors is the same architecture on a different platform.
The decision stands. Three acceptable stations: three Basic-class panels. One screen: a sixteen-connection panel, or a collector with both sides proven. Two TDEs: no.
Questions asked
Can the LOGO! TDE be the screen that watches all twelve controllers?
No. A TDE is the LOGO! family's own text display for the station it serves; the documented connection capacities in this article belong to HMI panels. The two-TDE arrangement gives two local text screens at two cabinets, not the single shared overview the job asks for, and it was sized by a wired analog-input figure that does not apply to networked alarm bits.
How many alarm points can the screen actually list for twelve boilers?
Count points, not boilers: one summary bit plus two cause bits per boiler is 12 × 3 = 36 discrete points, trivial traffic for an Ethernet link. The binding limit is the connection count on the panel, not the bits behind each connection. Add one validity bit per boiler so a frozen value can be told apart from a live one.
Do the 4–20 mA sensor loops need to reach the screen as analog signals?
No. Each boiler's two loops terminate on its own controller, inside its local analog-input budget, and the screen reads scaled values over Ethernet as ordinary numeric tags. No analog hardware, wiring or channel count is added at the panel: the analog-input maximum of a LOGO! governs only the loops wired to that LOGO!.
What should the screen show when one boiler's controller drops off the network?
An explicit offline state, never the last value. Give every boiler a validity or heartbeat bit and configure the display so a failed link marks that boiler's values and alarms unavailable while the others keep updating. The controller's local loop keeps running on its own outputs; only supervision is affected, and recovery should return the values with their live indication restored.
Can a boiler trip depend on this supervisory screen?
No. Over-temperature protection stays in each boiler's own control loop, backed where the process requires it by dedicated protective hardware that does not depend on communications. The supervisory alarm list is an operator aid: it rides on an Ethernet link, a panel connection budget and a display, and none of those belongs in a protective path. Design the trip locally first, then show it on the screen.