Short answer
Yes. TIA Portal V17 with no updates can still edit, compile and transfer to a computer running WinCC Runtime Advanced V17 Update 8, because the documented compatibility boundary is the version, not the update number. Record both full versions, prove the pair with one controlled transfer, and install the matching runtime update separately only if you later update the engineering.

On this page
- Can TIA Portal V17 without updates load a project into Runtime Advanced V17 Update 8?
- Why doesn't the runtime's update number have to match the engineering?
- When do engineering and runtime updates have to move together?
- What should you record before you compile and transfer?
- How do you prove the combination before production?
- When should you update the engineering anyway?
- Does the runtime update change the license you need?
- Questions asked
Runtime updates and engineering updates are separate packages, and after every runtime update the same question lands on the bench: the runtime computer now runs WinCC Runtime Advanced V17 Update 8, the engineering computer still runs TIA Portal V17 with no updates — can you keep editing and loading with that engineering, or must it move to the same or a newer level first? You can keep it. The documented compatibility boundary is the version V17, not the update number, and the runtime update installs only on the runtime computer. What does move together is the pair in the other direction: a TIA Portal update brings a matching runtime update that has to be installed separately. What follows is the basis for that decision, the version record to keep, and the single controlled transfer that proves the combination on the real machine.
Can TIA Portal V17 without updates load a project into Runtime Advanced V17 Update 8? #
Yes. A project compiled by TIA Portal V17 with no updates transfers to and runs on a computer with WinCC Runtime Advanced V17 Update 8, because the compatibility boundary in the documentation is the version V17 itself, not the update number.
Engineering and runtime are separate installations with separate update packages: the engineering creates and compiles the application, the runtime executes it on the target computer. An update designation names a maintenance level inside the V17 release; a release designation names the product generation. The documented restrictions on mixing the two sides are written at generation level, and a runtime at Update 8 is still a V17 runtime. For edit-and-load work, the decision is to retain the engineering at its installed level and spend the change on the transfer test further down, not on an engineering update that nothing requires.
Why doesn't the runtime's update number have to match the engineering? #
An update is a maintenance level inside the V17 release: it installs on the runtime computer on top of the existing Runtime Advanced V17 installation and repairs runtime defects without turning the project into something another V17 engineering level cannot produce.
Two documented properties carry that answer. First, the update notes for Runtime Advanced describe the mechanism: the update is installed on the runtime system, and it installs only when that runtime version is already present. Nothing in the package reaches back into the engineering installation. Second, the WinCC readme section called Notes on operation of Runtime Advanced draws its line at versions: only the runtime version matching the engineering can be started from the engineering system, and other versions can only be simulated. Updates inside V17 never cross that line.
So a project compiled by any V17 engineering level is a V17 project, and a V17 runtime, base or updated, is the executable for V17 projects. A version gap is the different, harder case: running a TIA Portal V14 HMI on WinCC Runtime Advanced shows what a true generation mismatch demands, and no number of updates inside V17 says anything about it.
When do engineering and runtime updates have to move together? #
The coupling runs from engineering to runtime, never the other way: when you install a TIA Portal update, its matching runtime update has to be installed separately on the runtime computer, for example to enable simulation.
The pairing is documented, not assumed. Siemens' updates entry for STEP 7 V17, S7-PLCSIM V17 and WinCC V17 states that TIA Portal V17 Update 4 contains WinCC Runtime Advanced V17 Update 2, that this runtime update is required for simulation among other things, and that it has to be installed separately. Read the direction carefully: a newer engineering level pulls the runtime up to its paired update, while a newer runtime level pushes nothing onto the engineering.
That asymmetry settles your case. Base-level engineering triggers no pairing requirement at all, and the Update 8 runtime on the production computer waits for nothing from the engineering side. Keep this rule for the day you do move the engineering: that is the moment the runtime computer needs its own separate update.
What should you record before you compile and transfer? #
Record four items: the engineering's full product version and update level, the runtime's update level read from the installed software, the project's configured target, and the license actually installed on the runtime computer.
Read each one from the installed product information on its own machine, not from the project file name, a desktop shortcut or an installation medium label. A note saying only 'V17 installed' is not a record; write the full designation, for example 'engineering: TIA Portal V17, no updates' and 'runtime: WinCC Runtime Advanced V17 Update 8'. Confirm the project's target really is Runtime Advanced at V17, and note the runtime computer's operating system, because the delivery release for SIMATIC WinCC V17 names the Windows versions it supports.
One prerequisite deserves a minute: if the engineering computer shows no HMI option at all, the WinCC engineering component is missing and has to be installed first, the case covered in TIA Portal shows no HMI option: install WinCC Engineering.
How do you prove the combination before production? #
With one controlled transfer on the real runtime computer: keep a copy of the project, compile it in the base V17 engineering, load it over the existing application in a maintenance window, and watch it start and run.
A compile pass proves the project against the engineering, not against the destination, so the proof is the load itself:
- Archive the current project and the runtime computer's present state before touching either installation.
- Compile the copy in the base V17 engineering with zero errors.
- Schedule the load into a maintenance window with the machine in a safe state, because the runtime application restarts during transfer and the operator screens go dark mid-load.
- After the restart, confirm the runtime starts, process tags cycle against the controller, alarms and scripts fire, and no license message appears.
- Write the accepted combination into the deployment record together with the documents relied on.
Worked example, with illustrative numbers: the engineering computer reports TIA Portal V17, no updates; the runtime computer reports WinCC Runtime Advanced V17 Update 8 with a license sized for 512 PowerTags; the project counts 350 PowerTags. License check: 350 is less than 512, so the entitlement covers the project. A planned second station adds 200 tags, and 350 + 200 = 550 exceeds 512, so the license must be resized before those tags go live — a licensing task unrelated to the update levels. The compatibility check is the five steps above: when the runtime restarts on the Update 8 installation and runs the freshly loaded project, the pair is proven for that deployment.
When should you update the engineering anyway? #
Update the engineering for three reasons only: a defect in your project is fixed in a named TIA Portal update, you need simulation at a newer engineering level, or you are preparing a migration that wants both sides aligned.
For a defect, read the update's notes first, since they name what each level fixes, then update the engineering and, in the same change, install the paired runtime update separately on the runtime computer — exactly the pattern the Update 4 entry shows. For simulation, remember it runs on the engineering computer, so the runtime installed next to the engineering is what matters, not the production machine's level. For a migration to a newer release, align both sides first so the migrated project compiles against a known pair.
Staying at the base level has costs of its own, and they appear away from this transfer: online access to newer controller firmware can fail outright, as when an old engineering cannot go online with an S7-1500 (why TIA Portal V14 cannot go online with an S7-1500). Outside those three reasons, leave the engineering alone — every engineering update is a change you have to retest, and nothing about an Update 8 runtime requires one.
Does the runtime update change the license you need? #
No. Runtime Advanced V17 Update 8 is still WinCC Runtime Advanced V17, so the license that authorized V17 before the update authorizes it after, and the size of that license is still decided by the number of PowerTags the project uses.
The update changes maintenance code, not the version the license names, so it never enters the licensing comparison. The comparison that matters is the one in the worked example above: the project's PowerTag count against the licensed count, with the count read from the engineering software before the transfer. Which license versions authorize which releases is a separate entitlement question, covered in which WinCC license versions authorize older releases.
Questions asked
Can you still simulate with the runtime computer at Update 8?
Simulation runs on the engineering computer, so the production computer's update level plays no part in it. The readme allows only the runtime version that matches the engineering to be started from the engineering system; other versions can only be simulated. With base V17 engineering, simulate against the base V17 runtime installed on the engineering computer, while the production computer keeps Update 8.
Does Runtime Advanced V17 Update 8 also run projects from older versions like V16?
No. The version line is strict at runtime: Runtime Advanced V17 executes V17 projects, and the readme treats every other runtime version as simulatable only. A V16 project must be opened, migrated and compiled in TIA Portal V17 before any V17 runtime, updated or not, can load it. No runtime update removes that migration step.
What exactly is a PowerTag for the license count?
A PowerTag is a process tag used for communication with the automation process, and the runtime license is sized by how many the project uses. Screen objects and internal calculations are not the counted quantity. Read the count in the engineering software's licensing information before the transfer, not from the number of screens.
Does the runtime update also affect HMI panels?
No. Runtime Advanced is the PC runtime only. Comfort panels receive their firmware as a panel image, matched to the project version by a separate mechanism with its own version rules. An update installed on the runtime computer changes nothing on a panel, and a panel image change changes nothing on the PC runtime.